Fellowes Expands Lines of Monitor, Laptop Accessories

Interior workplace solutions provider Fellowes recently announced that it is expanding two of its popular product lines. The extensions to its Sena and Rising lines will offer new degrees of functionality and aesthetic appeal to a wide variety of corporate and educational environments, according to a news release.

Fellowes’ Sena line of monitor solutions now includes six new configurations. The SenaEX4 and SenaEX6 monitor arms can respectively hold four and six monitors, with additional options providing four quad configurations and two six-monitor configurations. The products assist with multi-monitor environments and provide additional flexibility regarding screen placement and comfort.

Fellowes is also releasing two new laptop holders, one for the Rising series and one for the Sena series. The products integrate with existing Fellowes products to provide secure and aesthetically pleasing arm support within the workspace.

The product line extensions come in black, white, or siler finishes. The models are Level 2 Certified and BIFMA Complaint, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • T&T Construction Management Group Completes Pasco High School Expansion

    Pasco High School in Dade City, Fla., recently announced that it has completed an expansion project in partnership with T&T Construction Management Group, Inc., Harvard Jolly Architecture, and Williams Company.