Princeton University Orders Mullen Class 3 EV Truck

Mullen Automotive recently announced that Princeton University in Princeton, N.J., recently purchased a Mullen THREE, Class 3 electric vehicle (EV) box truck upfit for its facilities operations unit, according to a news release. The unit includes about 350 vehicles—including cars, vans, golf carts, and construction vehicles—for various transportation needs around campus. The university launched a fleet of 17 electric buses and charging facilities in fall 2023 in an effort to achieve net-zero carbon emissions by 2046, the university’s 300th anniversary.

“We are proud to work with Princeton in their journey towards a net-zero carbon emissions campus,” said Mullen Automotive CEO and chairman, David Michery. “This purchase marks a significant milestone for Mullen as we continue to expand our presence in the higher education sector.”

The Mullen THREE Class 3 low cab forward EV truck is all electric and features a 125-mile range with a large payload. The chassis’s rail design supports upfits and customization for specific vocational needs. The truck recently qualified for a $15,000 incentive through the State of Massachusetts’ MOR-EV program and a $45,000 cash rebate voucher through the California Hybrid and Zero-Emission Truck and Bus Voucher Incentive Program, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.