Georgia Gwinnett College Construction Project Nears Completion

The Georgia Gwinnett College (GCC) Gateway Building and Infrastructure project in Lawrenceville, Ga., is on track for its November 2024 completion date, according to a news release. The project consists of a new central energy plant and the construction of the university’s first-ever Convocation Center.

The Convocation Center (or Gateway Building) covers a total of 72,280 square feet and includes student services like wellness, recreation, food service, convocation, and events. Meanwhile, the central energy plant will be built in a separate structure and serve the entire campus. Development stems from a 2015 university study on how to coordinate campus utility systems with planned architectural growth. Once complete, the central energy plant will provide chilled water for the Gateway Building and nine more buildings on campus.

The college partnered with architects SSOE Group and Hughes Group Architects, engineer RMF Engineering, and general contractor Carroll Daniel Construction.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • A digital silhouette works at a computer, immersed in a glowing, interconnected world

    How Will AI Transform Learning Space Design?

    For years, higher education has designed learning spaces around technology as a tool for display, capture, collaboration, and connectivity. AI changes that equation.

  • University of Oklahoma Announces New Campus Master Plan

    The University of Oklahoma in Norman, Okla., recently announced that it will soon launch a new, comprehensive Campus Master Plan to guide the campus’ physical development during the next decade, according to a news release.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.