Zurn Elkay Announces Updated Line of Filtered Bottle Filling Stations

Zurn Elkay Water Solutions recently released an updated line of its Elkay Filtered Bottle Filling Stations, according to a news release. The new line features a sleeker design and functional upgrades to help simplify filter maintenance and reduce long-term labor costs. The ezH2O Bottle Fillers, which debuted in 2010, were designed to reduce lead, PFOA/PFOS, and other contaminants.

The units were designed for public spaces like schools, universities, office spaces, gyms, and more. The updated line features the new colors Midnight Black, Arctic White, and Standard Gray. “With the 51600C High-Capacity Replacement Filter, the filter life is doubled to 6,000 gallons and is certified to NSF/ANSI 42, 53 and 401 for the reduction of lead, microplastics, cysts, Class 1 particulate and chlorine taste and odor. Elkay’s WaterSentry 71300C is also rated for the reduction of PFOA/PFOS, two prevalent PFAS chemicals, commonly known as ‘forever chemicals’ for the highest-performing filtration option,” according to the news release.

Other features include a drop-down wrapper, LED filter status display, and an automatic filter light reset. Clients can track data like the number of bottles saved, water usage, and filter status, as well as schedule flushing events to keep plumbing lines clean.

More information is available on the Zurn Elkay website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Building Beyond Simulation: Creating Immersive Ecosystems for Healthcare Education

    Health sciences education is one of the fastest-growing facility types in colleges and universities. The demand for medical, nursing, and allied health professionals is driving the creation and renovation of medical simulation training facilities that provide students with real-world experience through advanced simulation-based learning.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • Montclair State University Starts Construction on $120M STEM Building

    Montclair State University in Montclair, N.J., recently broke ground on a new $120-million Interdisciplinary Science Building, according to university news. The university partnered with HoK Architects for the project’s design, and it’s scheduled to open in time for the 2028–29 academic year.

  • DLR Group Hires Three for Higher Education Practice

    Integrated design firm DLR Group recently announced that it has brought three new hires on board to help shape its higher education practice in California and the northeast, according to a press release.