Massachusetts Charter School Opens New Academic Building

The Advanced Math and Science Academy Charter School (AMSA) in Marlborough, Mass., recently held a ribbon-cutting ceremony for a new academic building, according to a news release. The 17,000-square-foot space will serve as a classroom and science lab building for the student population of almost a thousand in grades 6–12. AMSA partnered with Finegold Alexander Architects for the project’s design.

“We are thrilled to see the completion of the new Academic Building. It has been a wonderful opportunity to collaborate with the leadership at AMSA to expand the school’s academic footprint.” said Regan Shields Ives, Finegold Alexander Principal and K-12 studio leader.

The academy consists of three buildings in a former office park. The school and architects partnered closely to align the layout and design according to the school’s rigorous academic program. The new construction project also involved redesigning campus site circulation to facilitate pick-up and drop-off traffic, the news release reports.

“Finegold Alexander has done an incredible job transforming our campus into a modern, 21st-century education environment that truly fosters student learning and creativity,” said AMSA Executive Director Dr. Lisa C. Mobley. “These new spaces will enable us to serve our students more effectively, making a real and lasting impact on their academic experience.”

According to the project website, the goal of the new space is to offer scheduling flexibility and updated learning opportunities incorporating state-of-the-art technology.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).

  • El Paso District Breaks Ground on New Elementary School

    The Canutillo Independent School District in El Paso, Texas, recently announced that construction has begun on a 119,000-square-foot elementary school, according to a news release. The district partnered with Pfluger Architects, Carl Daniel Architects, and LDCM Solutions on the new Davenport Elementary School, which has an expected completion date of 2027.