Boise State University Starts Construction on New Academic Building

Boise State University in Boise, Idaho, recently broke ground on the new ESI Construction Management Building, according to university news. The university is partnering with Engineered Structures, Inc., for the building’s construction. It will play home to the university’s construction management program and include amenities like classrooms, offices, meeting rooms, and lab space.

University news reports that student enrollment in the program has increased by 80% over the last six years. The university partners with local contractors to provide internship opportunities to students, and the program has a post-graduation job-placement rate of 100%.

“When we talk about construction management, what we’re talking about is building. That’s what Boise State does. It builds stronger, more creative, more resilient and smarter people. It builds a stronger, more resilient and more creative Idaho,” said Boise State University President Dr. Marlene Tromp. “As we look forward to the future of this great state, we have so much to owe to all of you who have had a hand in taking the character of this program and using it to advance this state, to grow the impact of Boise State University, and to change our future for the better.”

The building will be equipped with the latest construction technology and include features like a student collaboration area, a computer lab of 40 seats, classrooms, conference and competition team rooms, a high bay featuring an overhead crane, and dedicated outdoor learning space.

The university also partnered with Lombard/Conrad Architects for the building’s construction, according to the university website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

Digital Edition