East Carolina University Selects Architect for $60M Residence Hall Renovations

East Carolina University in Greenville, N.C., recently announced that it has selected the KWK/Jenkins Peer Architects (JPA) team, collaborating with INTREPID Architecture, to design renovations for two of its residence halls, according to a news release. The goal of the $60-million project is to offer more modern amenities, accessibility, and a better use of space for Jones Hall (built in 1958) and Legacy Hall (built in 1960).

The news release reports that Jones Hall has room for about 430 students and houses the university’s Campus Living offices. Legacy Hall has room for about 470 students and is the only residence hall on campus that is not ADA-compliant. Construction on Legacy Hall will begin in May 2025 and finish by July 2026. Construction on Jones Hall has an expected start date of May 2026 and completion date of July 2027.

Legacy Hall exterior
Image Courtesy of KWK Architects

The work includes replacing mechanical, electrical, and plumbing systems in both halls; updating windows and roofs; installing private facilities in hall bathrooms; creating an ADA-compliant, ground-floor entrance to Legacy Hall; adding public lounge space and an elevator to Legacy Hall; and building the green space around both halls.

“The Legacy work will include the addition of a two-story mezzanine room to reinforce a contemporary sense of place and provide a welcoming space for students, in addition to incorporating access to a new elevator for all floors,” said Javier Esteban, KWK Architects Principal. “The renovation of both halls will also include updated, individual bathrooms that allow complete privacy for the students, and at the same time far exceeds ADA requirements.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • R.I. District Holds Ribbon-Cutting Ceremony for New Elementary School

    Cranston Public Schools in Cranston, R.I., recently announced the completion of Gladstone Elementary School, according to a news release. The 100,000-square-foot facility serves as a replacement for the 1950s-era former building, and it consolidates the student, faculty, and staff populations of Gladstone and Arlington Elementary Schools.

  • Missouri K–12 District Cuts Ribbons on Two New Middle Schools

    Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.

  • Embry-Riddle Completes Construction on Research, Lab Facility

    Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer.