Washington University School of Medicine Completes $165M Expansion Project

The Washington University School of Medicine in St. Louis, Mo., recently completed a vertical expansion of its Steven & Susan Lipstein BJC Institute of Health (BJCIH), according to a news release. The university partnered with Lawrence Group for the design of the six-floor addition, which cost about $165 million.

The project adds 160,000 square feet of lab and research space to the building’s north tower. Amenities will include a 7,400-square-foot Biologic Therapy Core Facility (BTCF), which will manufacture cellular therapies for cancer treatment; 100,000 square feet of lab space expansion; and about 43,000 square feet of mechanical building-support space. The project also includes a new elevator shaft in the building’s northwest corner, the news release reports.

“Lawrence Group’s design team collaborated closely with the owner’s critical facilities engineers to develop design criteria, testing requirements, and construction details for the project and to ensure compliance with industry standards in the design,” said Ryan King, Lawrence Group Principal and Healthcare Market Leader. “The Lawrence Group team used its bank of healthcare expertise and creativity to design this unique solution for the university.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Montclair State University Debuts New VR Facility

    Montclair State University in Montclair, N.J., recently announced the completion of a new virtual reality learning facility developed in partnership with Dreamscape Learn, according to a news release. The 2,450-square-foot lab space is inside the College of Communication and Media building and will serve students pursuing careers in digital media, virtual reality, and content creation.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Cleveland High School Breaks Ground on Modernization

    Portland Public Schools in Portland, Ore., recently announced that construction has begun on a modernization project for Cleveland High School, according to a news release. The existing building will be replaced with a new, 300,000-square-foot facility at the same site.

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.