California High School Starts Construction on New CTE Building

Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking. The district partnered with Quattrocchi Kwok Architects (QKA) for the project’s design and GCCI for construction.

Amenities will include a fabrication studio with built-in welding equipment; dedicated classrooms for innovative technology, science, agriculture, and culinary skills; collaboration rooms and prep rooms; three flex classrooms; utility spaces; and storage, according to the news release.

“This new facility represents a significant investment in our students’ futures,” said WSCUHSD Superintendent Chris Meredith. “These modern, well-equipped spaces will allow students to explore their passions and develop the specialty skills needed for success. Thank you to the community for its continuous support in making this project a reality, and our dedicated project team for guiding us through this process.”

Work also includes improvements to the adjacent site, as well as paving and landscaping to merge the new facility into a single cohesive campus environment. The project will cost an estimated $27 million, with funding coming through local Measure A bond funds, the news release reports.

“We are proud to partner with the West Sonoma County Union High School District on this transformative project,” said Kevin Chapin, QKA Principal. “We aim to foster innovation through design and these spaces will facilitate the expansion of important career-readiness programming on campus.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Armstrong World Industries Acquires Parallel Architectural Products

    Armstrong World Industries, provider of interior and exterior architectural applications, recently announced that it has acquired the Colorado-based Parallel Architectural Products, according to a news release.