Kraus-Anderson Continues Work in Minnesota School District

Maple River Schools in Mapleton, Minn., recently began construction on another project included in a district long-range facilities plan. Construction management firm Kraus-Anderson recently began work on two new classrooms and an outdoor track and field facility, according to a news release. The track facility will include a discus & shotput area, as well as a sand-jump pit.

The district partnered with ISG to design the project, which has an estimated completion date of July 2025. Funding comes from a $63.3-milllion bond referendum passed in February 2020, the news release reports.

As part of the same facilities plan, Kraus-Anderson recently completed the construction of Maple Rivers Schools, a K–12 school that covers four rural counties in Minnesota. The 200,000-square-foot campus includes three gymnasiums, a 500-seat auditorium, and a middle/high-school wing with specialized career-tech classrooms, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Campus Safety Requires Using Every Resource Available

    Across the U.S., school and campus leaders are facing a security landscape that has changed dramatically over the past decade. Incidents on school property have increased in recent years, with several consecutive years setting record totals. According to analysis of data by CNN, dozens of shootings now occur on school grounds annually across K-12 and higher education environments.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.