MiraCosta College Completes $42.5M Chemistry, Biotechnology Building

MiraCosta College in Oceanside, Calif., recently finished construction on a new, $42.5-million Chemistry and Biotechnology Building, according to a news release. The university partnered with builder C.W. Driver Companies and HED Architects on the 20,630-square-foot facility, which will serve the school’s expanding STEM programs.

The new facility includes shaded outdoor gathering spaces that connect to the larger STEM quad, as well as covered porches and screened study spaces to encourage outdoor collaboration. The interior uses high-efficiency fixtures, eco-friendly materials, and sustainable finishes that integrate with the surrounding campus. The building was designed to meet LEED Silver certification standards, according to the news release.

“This is a significant milestone for MiraCosta College as we officially open the doors to the new Chemistry and Biotechnology Building,” said MiraCosta College Project Manager Joe Webber. “The world is facing challenges that will require innovative solutions, and STEM education will play a vital role in shaping the future. This facility provides our students and faculty with the tools, technology, and resources they need to explore, innovate, and make meaningful contributions to these fields.”

Amenities include modern instructional and lab spaces designed to meet industry needs and provide students with practical skills.

“We are proud to have collaborated with MiraCosta College on delivering this transformative facility,” said Andy Feth, C.W. Driver project executive. “Designed with sustainability, innovation, and student success in mind, this building represents our ongoing commitment to creating high-quality, future-ready educational spaces.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Connecticut Upgrades Basketball Facility’s AV Systems

    The University of Connecticut recently partnered with Metinteractive to upgrade the AV systems of the Gampel Pavilion basketball facility on its campus in Mansfield, Conn., according to a news release.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.

  • Georgia High School Debuts 500-Seat Esports Arena

    Cass High School in Bartow County, Ga., recently announced the opening of a new, 7,000-square-foot Esports Arena, according to a news release. The Bartow County School System partnered with Extron AV Technology on the project.

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

Digital Edition