ProTeam Launches GoFit 6 HEPA Backpack Vacuum

Technology leader Emerson recently introduced the new ProTeam GoFit 6 HEPA backpack vacuum, according to a news release. The vacuum was designed to capture 99.97% of particulates down to 0.3 microns—including atmospheric hazards like lead dust, mold spores, and other particulates—through an advanced filtration system.

Product amenities include HEPA filtration; multiple applications including remediation and lead-safe abatement, as well as use in hospitals, clinics, and patient-care settings; alignment with the EPA’s definition of a HEPA vacuum according to the Lead Safety Renovation, Repair, and Painting Rule; and a unique method of suction that avoids agitating dust, the news release reports.

“The new GoFit 6 HEPA is an evolution from our LineVacer,” said ProTeam Vice President and General Manager Matt Reimers. “Launching this unit is the latest in expanding our GoFit product lineup which features corded and cordless models. All these vacuums, including the new HEPA unit, are designed to make efficient use of our customers time while feeling comfortable to wear.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • University of Kansas Opens $400M Football Stadium Reconstruction

    The University of Kansas in Lawrence, Kan., recently announced that the $400-million reconstruction of David Booth Kansas Memorial Stadium is complete in time for the 2025 football season, according to a news release. The university partnered with Turner Construction Company on the project.

  • Different Starting Points, Same End Goal

    Higher education campuses can enhance student experience by implementing mobile credentials to streamline building access, on-campus payments, and access to other amenities. This enables students to connect to their campuses through the technology they use most: their mobile devices.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

Digital Edition