Zurn Releases New Ductile Iron Frame Trench Drain System

Zurn Elkay Water Solutions recently released the newest addition to its Train Drench portfolio, the Ductile Iron Frame Trench Drain System, according to a news release. The product is designed for heavy-duty applications like airports, military, universities, and more.

The lightweight, durable iron frame adds DIN F loading capacity and incorporates a center bolt lockdown to meet DIN F load requirements, as well. The 6” system includes the standard, radiused bottom of the Z886 Perma-Trench Drain channels, which reduces the buildup of sediment and increases rate of flow. Zurn also offers trench channels with black additives for UV protection.

“This new system leverages the benefits of Zurn’s market leading 6” trench channel system,” said Nick Heschke, Siteworks Product Manager at Zurn Elkay. “We’ve expanded on our standard trench drain systems to provide even more durability and strength. We’re helping our customers to reduce the installation time required for DIN F drain trench systems that typically are difficult to transport and install with current market solutions.”

According to the news release, the new system has lightweight modular sections that cut down installation time by up to 75% compared to polymer concrete frames. Rebar clips allow for easy attachments to rebar, as well as height adjustments. The longer, lightweight lengths have fewer joints and are durable enough for easy handling.

More information is available on the Zurn website.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Greenheck Receives Sourcewell Cooperative Contract

    Air movement, control, conditioning, and distribution equipment solutions provider Greenheck recently announced that it has been awarded a Sourcewell cooperative purchasing contract, according to a news release. The HVAC Systems contract will allow Greenheck the opportunity to expand opportunities in government procurement and other public agencies in North America.

  • California High School Starts Construction on New CTE Building

    Analy High School, part of the West Sonoma County Union High School District (WSCUHSD) in Sebastopol, Calif., recently broke ground on a new Career Technical Education (CTE) Building, according to a news release. The 15,000-square-foot facility will offer specialized facilities for students in engineering, welding, culinary arts, agricultural sciences, and design thinking.

  • Springfield Breaks Ground on $53.7M Pipkin Middle School Rebuild

    Construction is underway on a new, state-of-the-art Pipkin Middle School in Springfield, Mo., a major step in Springfield Public Schools’ (SPS) long-term facility improvement plan, according to local news. The $53.7-million project officially broke ground in early June, following years of planning and community input aimed at modernizing aging infrastructure and addressing student capacity concerns.

  • College of the Mainland Starts Construction on New Library & Learning Center

    College of the Mainland in Texas City, Texas, recently held a groundbreaking ceremony for its new Library & Learning Center, according to a news release. The new facility is part of a larger, $250-million campus expansion project funded by a 2023 bond program.

Digital Edition