Tufts University Breaks Ground on Two New Residence Halls

Tufts University in Medford, Mass., recently broke ground on two new residence halls with a total capacity of 664 beds, according to local news. The project’s ultimate goal is to expand on-campus housing and reduce pressure on the local housing market. The university is partnering with Capstone Development Partners through a public-private partnership (P3) to develop, finance, and manage the new property, as well as with Elkus Manfredi Architects and Erland Construction.

The development will take over a former parking lot and cover 271,000 square feet. The two buildings will contain studio, two-, four-, and six-bedroom units with an additional 12,000 square feet of amenity space, including lounges, conference rooms, laundry rooms, a bike room, and fitness and study spaces. It will also feature 4,000 square feet of retail and social spaces on the lower floors, local news reports.

“Aided by the expertise of our development team, we’ve been able to reduce construction costs and time and bring to fruition a project that will enhance student life, benefit our neighbors, and enliven our streetscape—all in an environmentally responsible way,” said Tufts University Executive Vice President Mike Howard.

The buildings will be all-electric and were designed with improved indoor air quality, enhanced energy efficiency, and airtight envelopes at top-of-mind. Landscaping and other off-site improvements will help blend the new facility into the existing neighborhood.

“This is more than a residence hall—it’s a community-building project,” said Walker May, Executive Vice President of Capstone. “By creating affordable, high-quality housing on campus, we’re supporting students and the surrounding neighborhood.”

The new space is scheduled to open for the fall 2027 semester, local news reports, and upper-division students will receive leasing priority.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.