Texas K–12 District to Build New Elementary, High Schools

The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

The project consists of building separate elementary and high-school buildings that will share a new gym and library facility. Construction has an estimated completion date of August 2027, local news reports. Once the new facility opens, the existing high school and elementary buildings will be demolished and replaced with school parking.

According to local news from April 2025, the existing facilities are 76 years old and are aging out of use. Three buildings—extracurricular facilities used for cheerleading, weight training, and athletics—have been condemned. Further review indicated that renovation and repair would cost almost as much as building new facilities.

“This will meet our needs,” said High Island ISD Superintendent David Walker. “This school is a part of the community in a lot of ways. If we didn’t have the school, we wouldn’t have our community.”

12NewsNow reports that design and construction plans will be finalized by September and that groundbreaking is scheduled for January 2026. The project should involve “very minimal traffic issues in moving students and everything,” said Walker.

The bond had originally promised no tax rate increase for local taxpayers. Instead, the district will implement a tax rate decrease of 8 cents, even with the bond’s passage.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Little Grand Market

    Designing for Belonging: Why Student Wellness Starts with Space

    From walkable site planning to flexible interiors, intentional design choices play a critical role in how students experience comfort, connection, and community.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.