Texas K–12 District to Build New Elementary, High Schools

The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

The project consists of building separate elementary and high-school buildings that will share a new gym and library facility. Construction has an estimated completion date of August 2027, local news reports. Once the new facility opens, the existing high school and elementary buildings will be demolished and replaced with school parking.

According to local news from April 2025, the existing facilities are 76 years old and are aging out of use. Three buildings—extracurricular facilities used for cheerleading, weight training, and athletics—have been condemned. Further review indicated that renovation and repair would cost almost as much as building new facilities.

“This will meet our needs,” said High Island ISD Superintendent David Walker. “This school is a part of the community in a lot of ways. If we didn’t have the school, we wouldn’t have our community.”

12NewsNow reports that design and construction plans will be finalized by September and that groundbreaking is scheduled for January 2026. The project should involve “very minimal traffic issues in moving students and everything,” said Walker.

The bond had originally promised no tax rate increase for local taxpayers. Instead, the district will implement a tax rate decrease of 8 cents, even with the bond’s passage.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Spaces4Learning Launches 2026 Facilities and Construction Brief Survey

    Spaces4Learning recently launched the 2026 Facilities and Construction Brief Survey, which collects data on the previous year’s K–12 and higher education construction projects nationwide.

  • Colorado School District Breaks Ground on Unified PK–12 Campus

    The Haxtun School District No. Re-2J in Haxtun, Colo., recently announced that ground has been broken on a renovation/addition project that will unite its two schools, Haxtun Elementary and Haxtun Jr/Sr High School, according to a news release.

  • Arlington High School

    Arlington High School

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. Arlington High School has been recognized with an EDS 2026 Grand Prize award in the category of New Construction.