California Middle School Completes Two New Academic Buildings

Sunnyvale Middle School in Sunnyvale, Calif., recently announced that construction is complete on two new classroom buildings of two stories each, according to a district news release. The new wing will house seventh- and eighth-grade students and is part of a larger campus modernization project. Quattrocchi Kwok Architects (QKA) and LPA, Inc., provided design services, while Blach Construction handled the build.

The two buildings add a total of 35,000 square feet, 23 adaptable classrooms, an art classroom, five student breakout spaces, a teacher collaboration area, and a 23,000-square-foot outdoor courtyard.

“I am grateful to our community for supporting our bond measures and making it possible to upgrade our school facilities. These improvements will directly enhance the learning experience for our students,” said Sunnyvale School District Superintendent Gudiel R. Crosthwaite. “I also want to thank our outstanding project team for staying on track with such an ambitious timeline. This allows us to make a meaningful difference for as many students as possible, as quickly as possible.”

The new wing is on track toward receiving a Collaborative for High Performance Schools (CHPS)-Designed certification. Design elements emphasizing sustainability include bioretention basins to capture and filter stormwater as well as solar panels as a source of renewable energy.

“Collaboration was key to bringing the stakeholders and design teams together to meet programmatic goals to deliver a project ready for students to start the school year,” said LPA, Inc., senior project manager Denise Flatley. “Locating the buildings to create a courtyard that connects to Spartan Square, leaving space for the future growth of the campus by utilizing two-story buildings, and emphasizing the need for interior and exterior learning space for the social and emotional growth of the students were our top priorities. The result is a student centric space we are excited to see students use daily.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • California School District Completes Elementary School Modernization

    The San Diego Unified School District in San Diego, Calif., recently held a ribbon-cutting for a whole-site modernization of Pacific Beach Elementary School, according to local news. The school first opened with one building in 1930 and added six more between 1938 and 1957.

  • Zurn Elkay Releases 2025 Sustainability Report

    Zurn Elkay Water Solutions recently announced the release of its annual sustainability report, according to a news release. The 2025 report discusses the organization’s efforts to maintain good environmental stewardship and the solutions provided in helping customers meet sustainability goals.