Texas District Finishes Construction on New Middle School, Admin Building

The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

The July 31 ceremony included an open house and guided tours before the start of school on Aug. 13. Funding for the middle school came from Bond 2021, a $38-million bond referendum that went toward new facilities, renovations, and repairs and upgrades around the district. Funding for the administration building came through local resources and wasn’t included in the bond package, according to the news release.

“These new facilities are a testament to the vision of our community and the commitment to creating learning environments where our students can thrive,” said WISD Superintendent Wade Stanford. “We’re already seeing a positive impact on student engagement and staff collaboration.”

The district partnered with Fitzpatrick Architects and Pfluger Architects for the project’s design, as well as Jackson Construction for construction services. The project consisted of renovating four existing buildings into a single facility. The campus consists of new and refurbished buildings that took advantage of existing structures, foundations, and loadbearing walls.

“The design intent is to support the learning space profile defined by input from the community, parents, staff, and students,” said Pfluger CEO Terry Hoyle. “The learning spaces include flexible and comfortable instructional spaces; collaborative spaces for engagement, creativity, and student choice; and non-academic spaces for community engagement and outdoor learning.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Sam Houston State University Completes Athletic Stadium Renovations

    Sam Houston State University in Huntsville, Texas, recently announced the reopening of Elliott T. Bowers Stadium after an extensive renovation project, according to a news release. The university partnered with Stantec and DLR Group for the project’s design.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Fayetteville State University Opens New College of Education Building

    Fayetteville State University (FSU) in Fayetteville, N.C., recently celebrated the opening of a new $69.3-million College of Education building, according to a university news release.