Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026. Other partners were TurnerBaston Architects as project architect and M.J. Harris Construction Services, LLC, as the general contractor.

The Smith Family Center for Performing Arts will measure in at 130,088 square feet and bring all of the Department of Theatre and Dance’s academic and performance needs within a single area on campus, the news release reports. Amenities will include a 450-seat dance theater, a 350-seat drama theater, a 250-seat studio theater, a scenery shop, rehearsal space, and control rooms.

“We are proud to celebrate this important milestone alongside UA and our project partners,” said HPM Senior Project Manager Austin Fisher. “The Smith Family Center for Performing Arts will be a centerpiece for creativity and learning on campus, and reaching the topping out is a testament to our teams’ expertise and dedication to getting the job done on time. We look forward to bringing the vision for this facility to life and delivering a space that will inspire generations of students, faculty members and audiences.”

The facility will connect via a new lobby to the Peter Bryce Main building, which—following construction—will house the department’s faculty offices and academic spaces.

The university and HPM have previously partnered on campus venues like Julia Tutwiler Hall, Bryant Denny Stadium, Rhoades Softball Stadium, Coleman Coliseum, and the Mal M. Moore Athletic Facility, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.