UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026. The university partnered with Stantec and HarrisonKornberg for the facility’s design and Vaughn Construction for construction management services, and the project took about 18 months to complete.

The building’s amenities include 18 classrooms, three research labs, nine teaching labs, a large event space, and a dedicated space for the Joint Admission Medical Program. It also houses the university’s chemistry, mathematics, neuroscience, and biology programs.

"This building gives our students a clear pathway to the health professions and opens up so many possibilities for teaching, research and degrees that were previously out of reach," said Dr. Muhammed Yousufuddin, a Chemistry professor, in a university news story. "It is truly a game-changer, and I am so excited for what it means for our students."

According to university news, the project was completed on time and under budget, and it represents the largest capital investment in the campus’ history. Design features include the use of natural light, energy-efficiency, and outdoor study areas.

"This building is a space designed to expand opportunity, strengthen innovation, and empower the next generation of leaders, scholars and changemakers both here in North Texas and beyond," said Dr. Christopher Markwood, Interim Provost. "We are grateful you’re here to celebrate this transformational moment for our students, our university and our growing community.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Texas District Finishes Construction on New Middle School, Admin Building

    The Westwood Independent School District recently held a ribbon-cutting ceremony for the new Westwood Middle School and Administration Building in Palestine, Texas, according to a news release. The campus covers 106,000 square feet and has the capacity for 650 students in grades 6–8, and it will also play home to the district’s staff and administration.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

  • California K–12 District Opens New Athletic Complex, Gym

    The San Mateo Union High School District (SMUHSD) in San Mateo, Calif., recently announced the completion of two new athletics facilities: a new gymnasium at Burlingame High School, and a new athletic training complex at San Mateo High School, according to a news release.

Digital Edition