University of Illinois Moves Forward with College Sports’ Largest Digital Scoreboard

The University of Illinois in Champaign, Ill., recently announced a series of upgrades to Gies Memorial Stadium that will include the largest scoreboard in college sports, according to a news release. The university is collaborating with Anthony James Partners (AJP) for the project, which will include planning design, support, and construction services. The project also entails stadium audio and broadcast system upgrades.

The new scoreboard will measure 69 feet high by 250 feet wide, measuring in at more than 17,300 square feet of LED surface. Its 10mm pixel pitch and 16.1-million total pixels create a 195% increase in resolution from the existing technology. Completion is scheduled before the beginning of the 2026 college football season. According to the news release, it will replace the stadium’s existing South End Zone display.

“This project exemplifies AJP’s commitment to combining innovative design with next-generation audio technology,” said Jack Covert, Anthony James Partners’ Vice President of Audio Engineering. “Gies Memorial Stadium’s new system will deliver the clarity, power, and excitement today’s fans expect from a premier college football venue.”

Stadium-wide improvements also include 16 additional LED displays totaling more than 26,700 square feet scattered across the stadium. Alongside the upgraded technology, the stadium will undergo structural and infrastructure coordination to accommodate the main scoreboard’s size.

The university chose Daktronics to provide the LED display after a “competitive procurement process,” the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.