Round Rock ISD Completes New Early College High School

Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500. The project broke ground in April 2024 and opened to students for the current semester.

The district partnered with program management firm HPM for the entire project. It also partnered with Bartlett Cocke as general contractor, O’Connell Robertson as architect, and Rabaa Kistner as the Geotech and construction materials testing consultant, the news release reports.

Campus amenities include academic classrooms, study rooms and lab spaces, a large commons area, a cafeteria featuring a 12x8-foot video wall, outdoor dining and study areas, and an administrative suite. The school offers a high-school and college-level curriculum, allowing students to graduate with both a high-school diploma and an associate’s degree.

“This facility represents more than just classrooms and labs. It’s a space where students can explore, grow and prepare for their futures,” said HPM’s senior manager of design and construction, Denish Sonani. “Collaborating with the Round Rock ISD to bring this vision to life reinforces our shared commitment to strengthening learning environments that serve students and the community for years to come.”

The project is part of the district’s 2018 voter-approved bond program to fund new construction, renovations, and infrastructure improvements around the district, according to the news release. HPM also partnered with the district for its 2024 bond program and is currently designing more than 15 associated projects.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • Doerr School of Sustainability Accelerator

    From Concrete Warehouse to Innovation Hub: Accelerating Sustainability at Stanford

    The transformation of a once windowless, concrete publishing warehouse into a sun-drenched center for global innovation began with a single, fundamental challenge: how to turn an industrial storage shell into a space built for human connection.

  • California K–12 District Completes Elementary School Campus Replacement

    The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade.