Round Rock ISD Completes New Early College High School

Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500. The project broke ground in April 2024 and opened to students for the current semester.

The district partnered with program management firm HPM for the entire project. It also partnered with Bartlett Cocke as general contractor, O’Connell Robertson as architect, and Rabaa Kistner as the Geotech and construction materials testing consultant, the news release reports.

Campus amenities include academic classrooms, study rooms and lab spaces, a large commons area, a cafeteria featuring a 12x8-foot video wall, outdoor dining and study areas, and an administrative suite. The school offers a high-school and college-level curriculum, allowing students to graduate with both a high-school diploma and an associate’s degree.

“This facility represents more than just classrooms and labs. It’s a space where students can explore, grow and prepare for their futures,” said HPM’s senior manager of design and construction, Denish Sonani. “Collaborating with the Round Rock ISD to bring this vision to life reinforces our shared commitment to strengthening learning environments that serve students and the community for years to come.”

The project is part of the district’s 2018 voter-approved bond program to fund new construction, renovations, and infrastructure improvements around the district, according to the news release. HPM also partnered with the district for its 2024 bond program and is currently designing more than 15 associated projects.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • University of Pittsburgh to Build New Residence Hall

    The Board of Trustees from the University of Pittsburgh in Pittsburgh, Penn., recently approved the construction of a new residence hall for first-year students, according to university news.

  • Phoenix School District Breaks Ground on New Prep Academy

    The Creighton Elementary School District near Phoenix, Ariz., recently broke ground on a campus replacement for Biltmore Preparatory Academy, according to a news release. The new space will allow the school to expand its enrollment by 50 percent for K–8 students and accommodate modern, collaborative learning styles.

  • Stanford Online Reveals New Immersive Learning Studio

    Stanford Online recently marked its 30th anniversary with the announcement of a new immersive learning studio, according to a university news release. The studio takes advantage of AI-powered and immersive learning technologies to continue delivering personalized and faculty-led education.