California K–12 District Completes Elementary School Campus Replacement

The West Contra Costa Unified School District (WCCUSD) in Richmond, Calif., recently announced the completion of a replacement campus for Lake Elementary School, according to a news release. The school has capacity for 470 students between Transitional Kindergarten (TK) and sixth grade. The district partnered with Quattrocchi Kwok Architects and Alten Construction for the build, which was funded by Bond Measure R.

“This campus marks a new era for our students and the entire community,” said Cheryl Cotton, district superintendent. “These facilities are a source of immense pride, replacing buildings that were no longer up to code or capable of supporting our educational programs. The campus now provides students and staff with the essential resources they need to thrive. Thank you to the project team and the community for your support in bringing our new school to life.”

Lake Elementary School exterior
Image courtesy of Quattrocchi Kwok Architects

The 56,700-square-foot campus uses a “Learning Suite” concept, grouping individual classrooms around open, flexible spaces, according to the news release. Amenities include a library, administrative space, and a multi-purpose building with a kitchen and cafeteria. Improvements to the outdated and undersized campus involved high-elevation, synthetic turf fields and paved play areas.

“We are proud to partner with the district and Alten to make the new Lake Elementary School a reality,” said John Dzbczak, QKA Principal. “Our priority was ensuring a safe learning environment both during the complex phases of construction and for generations of students to come.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.