Hawaii Elementary School Breaks Ground on New Classroom Building

Kealakehe Elementary School in Kailua, Hawaii, recently began construction on a new, $16-million classroom building for its campus, according to a news release. The 13,000-square-foot building will stand two stories and connect the existing upper and lower campuses. The district partnered with Urban Works, Inc., for the project’s design, the West Hawaii District Office for construction management services, and Nan Inc. for construction.

“This building has been a bridge, literally and figuratively, connecting the school, partners and our students’ education,” said Keith Hayashi, district superintendent. “From the support of Sen. Dru Kanuha and Rep. Nicole Lowen to the new DAGS district office and the designers who offered a solution that met school needs within site constraints, we are looking forward to this new building connecting the upper and lower campus and elevating the learning environments for students, teachers and staff.”

The facility will include four classrooms, an outdoor classroom, special education classrooms, a covered learning lanai, administrative space, and storage rooms, the news release reports. The new building will connect to existing buildings via two pedestrian bridges. Design features include neutral tones to blend with the natural landscape, as well as copper roofing, colored building outcroppings, and Hardie clapboard siding to give the school a lived-in, homey feel.

“We are grateful to the legislature and Governor Green for supporting the effort of creating a second district office on Hawaiʻi Island. Given the long travel times from Hilo to Kona, it was evident a second office was needed to properly service our schools and DAGS-managed facilities in West Hawaiʻi,” Keith Regan, comptroller and DAGS director, said. “It’s thanks to this support that we now have a highly skilled and motivated district engineer in place in West Hawaiʻi who has positively impacted our support of the DOE and our other operations.”

The building has an estimated completion date of Sept. 2027, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • How Proactive Maintenance Can Transform Athletic Facilities into Strategic Assets for College Sports

    College athletics is entering one of the most transformative periods in its history. With NIL reshaping financial models and competitive expectations, athletic departments across the country are being asked to do more than ever with increasingly constrained resources.

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • Health & Science Building

    Health & Science Building

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The College of Western Idaho's Health & Science Building has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • golden trophies with falling confetti

    Spaces4Learning Launches 2026 New Product Awards

    Spaces4Learning is happy to announce that we’re now accepting entries for the 2026 New Product Awards! The awards program recognizes the outstanding product development achievements of manufacturers and suppliers whose products or services are considered particularly noteworthy.