Stanford Completes Construction on Graduate School of Education Facility

Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort. Construction began in 2023.

The new GSE complex contains three buildings: the renovated Angela Nomellini & Ken Oliver Building (ANKO), the renovated Barnum Center, and the new Patricia & Jeffrey Raikes (Raikes) Building, the news release reports. ANKO, which was originally built in 1938, saw serious structural renovations that involved hollowing out the building’s core while maintaining the wings for historical preservation purposes. The building’s original Spanish tiles, windows, and ceiling elements were removed, restored, and replaced.

Restorations to the Barnum Center will allow it to be used as a classroom and event space; the building features 50 historic windows, as well as flexible space for student collaboration.

Finally, the Raikes Building features classrooms, meeting rooms, open offices, and event space. The fourth floor features a “premier convening space” with indoor and outdoor elements that offer scenic views of the campus and surrounding hillside.

“This project was both a challenge and a privilege,” said Jason Hughes, Vice President of Operations with McCarthy. “Working alongside Stanford and our design and construction partners, we were able to preserve the university’s rich architectural history while creating a forward-looking facility that supports the future of graduate education.”

During the project, key design considerations were historic preservation (especially in ANKO); structural innovation regarding the shoring and hollowing techniques used; and collaborative design, which involved extensive partnership with university stakeholders, according to the news release.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Moline-Coal Valley School District to Consolidate Two Schools into New Facility

    The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School.

  • Texas District Breaks Ground on Second High School

    The Waller Independent School District in Waller, Texas, recently held a groundbreaking ceremony for what will become its second high school, according to a news release.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part II

    As education leaders look toward 2026, the design of K–12 and higher education facilities is being reshaped by powerful, converging forces. Survey respondents point to the rapid growth of Career and Technical Education, deeper alignment with workforce and industry needs, and the accelerating influence of AI and emerging technologies.