Harvard Announces Replacement Facility for Native American Program

Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP)—both its academic and social components. The building will open in time for the 2027–28 school year.

Amenities will include offices, reception and recreation lounges, kitchens, a conference room, and a covered front porch and rear deck. The basement will play home to storage and mechanical space, and outdoor areas will provide space for cultural programming and ceremonies, the news story reports.

HUNAP’s current facility was built in 1873 and acquired by the university in 2023. A feasibility review found that the building’s structure was deteriorated beyond hope of renovation and that renovating the existing structure would “essentially require the construction of a new building within the shell of the existing building,” according to the Harvard Crimson.

HUNAP is a multi-school initiative within the university whose work encompasses “Native American studies, history, and cultural engagement, including academic programming, community events, research and travel grants, and tribal diplomacy efforts.” The facility’s design will invoke Native materials and symbolism; the exterior façade draws inspiration from tree bark and wampum.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Preparing for the Next Era of Healthcare Education, Innovation

    Across the country, public universities and community colleges are accelerating investments in healthcare education facilities as part of a broader strategy to address workforce shortages, modernize outdated infrastructure, and expand clinical training capacity. These projects, which are often located at the center of campus health and science districts, are no longer limited to traditional classrooms.

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.