Harvard Announces Replacement Facility for Native American Program

Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP)—both its academic and social components. The building will open in time for the 2027–28 school year.

Amenities will include offices, reception and recreation lounges, kitchens, a conference room, and a covered front porch and rear deck. The basement will play home to storage and mechanical space, and outdoor areas will provide space for cultural programming and ceremonies, the news story reports.

HUNAP’s current facility was built in 1873 and acquired by the university in 2023. A feasibility review found that the building’s structure was deteriorated beyond hope of renovation and that renovating the existing structure would “essentially require the construction of a new building within the shell of the existing building,” according to the Harvard Crimson.

HUNAP is a multi-school initiative within the university whose work encompasses “Native American studies, history, and cultural engagement, including academic programming, community events, research and travel grants, and tribal diplomacy efforts.” The facility’s design will invoke Native materials and symbolism; the exterior façade draws inspiration from tree bark and wampum.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Stanford Completes Construction on Graduate School of Education Facility

    Stanford University in Stanford, Calif., recently announced the end of construction on a new home for its Graduate School of Education, according to a news release. The university partnered with McCarthy Building Companies on the 160,000-square-foot project, which involved two major renovations and one new construction effort.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Photo credit: Elkus Manfredi Architects

    University of Virginia Selects Design-Build Team for New Residential Complex

    The University of Virginia in Charlottesville, Va., recently announced that it has selected a design-build team for a new upper-class residential development on campus, according to a news release. Capstone Development Partners—in partnership with Elkus Manfredi Architects and the Hoar Construction/Hourigan construction team—will move forward with the three-building, 310,000-square-foot housing facility.