Moline-Coal Valley School District to Consolidate Two Schools into New Facility

The Moline-Coal Valley School District in Moline, Ill., recently broke ground on a new elementary school that will consolidate the students and staff from two existing schools, according to local news. Robert Ontiveros Elementary School will serve as the new home for Lincoln-Irving Elementary School and Willard Elementary School, and it will have the capacity for 600 students in grades K–5.

Construction will consist of a 61,000-square-foot addition and 32,000 square feet of renovations to the existing Lincoln-Irving facility, local news reports. The project has an estimated completion date of fall 2027 and will cost $33.8 million.

“This is an incredible honor and moment of great pride and lasting significance that we all gather here today to officially dedicate this school and honor an extraordinary man,” said Chris Ontiveros, son of the building’s namesake, during the groundbreaking ceremony. “To name a school after an individual places their values permanently into the foundation and education itself and ensures that every student walks through these doors is reminded every single day of the power of character, work ethic, integrity and service. These are the very same qualities that my father portrayed and acted every single day of his life.”

The district partnered with Legat Architects for the project’s design and Estes Construction for its construction. During renovations, the students and staff of Lincoln-Irving will move to Western Illinois University through the end of the 2026–27 academic year.

“This project is more than a building,” said Jeff Sandberg, Legat Architects CEO. “It represents opportunity, growth and a commitment to the next generation of the community. By bringing Lincoln-Irving and Willard together into one unified environment, we're creating a space designed to support collaboration, innovation and student success.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • NWEA Report Recommends K–12 Natural Disaster Recovery Strategies

    The Northwest Evaluation Association (NWEA), a K–12 assessment and research organization, recently announced the release of a new playbook for schools and communities recovering from extreme weather events, according to a news release.

  • California K–12 District Finishes Renovations on Multi-Sport Stadium

    The Alameda Unified School District (AUSD) in Alameda, Calif., recently announced the completion of a renovation project on the Encinal Jr. & Sr. High School stadium, according to a news release. The district partnered with Quattrocchi Kwok Architects (QKA) and Bothman Construction on the facility, and funding came from Bond Measure B.

  • Spaces4Learning Launches 2026 Education Design Showcase Awards

    Spaces4Learning has opened submissions for the 2026 Education Design Showcase! The awards program launched in 1999 with the goal of celebrating innovative, practical solutions in the planning, design, and construction of K–12 and higher-education facilities. EDS recognizes new developments that help achieve optimal learning environments, as well as the architecture firms that brought the ideas to life.