UTampa Breaks Ground on STEM Academic Facility

The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028. The five-story facility will feature teaching and research lab space for a wide variety of STEM disciplines.

It will play home to the university’s departments of biology, chemistry, and biochemistry, as well as resources and programs in marine science, forensic science, allied health, and environmental science. Its labs and research spaces were designed to support interdisciplinary collaboration and discovery, the news release reports.

University President Teresa Abi-Nader Dahlberg said that the facility will serve as the “centerpiece and catalyst in the University’s growing prominence in science education and research,” the news release reports. She also described the complexities of installing the specialized equipment necessary for modern research, including sophisticated instrumentation, aquariums, and labs that will house “sea horses, algae, sea slugs, cell cultures, crabs, and zebra fish.”

The building is named in honor of Dr. Stephen F. and Marsha Dickey, who also provided what Marsha Dickey called a “family generational gift” toward the facility’s construction. The existing Dickey Health Center on campus is also named after them.

The university gathered input from faculty, students, and donors during the building’s design, according to Scott Gossen, assistant vice president of design, construction, and facilities. The Dickey Science Innovation Center will also be the twelfth building on campus to achieve LEED certification.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Back-to-School Playground Safety: 7 Common Hazards to Look for After Summer Break

    As summer break comes to an end, school administrators have plenty to prepare before students return. While classrooms, hallways and common areas often receive attention during all the back-to-school preparations, the playground should not be overlooked. Months of weather exposure, storms, and regular wear can leave behind hazards that may not be immediately noticeable.

  • UNH Marks Construction Milestone on Oceanic Exploration Facility

    The University of New Hampshire in Durham, N.H., recently celebrated a major construction milestone with a beam-signing ceremony for the new Center of Excellence for Operational Ocean and Great Lakes Mapping, according to a news release. The facility’s ultimate goal is to support research, training and technical assistance in ocean mapping.

  • University of Rochester to Break Ground on New Student Life Center

    The University of Rochester in Rochester, N.Y., recently began construction on a new Student Life building, according to a news release. The first floor will contain campus-wide gathering, program, and rehearsal space; the second floor will play home to the Greenbaum Center for Jewish Life.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.