UTampa Breaks Ground on STEM Academic Facility

The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028. The five-story facility will feature teaching and research lab space for a wide variety of STEM disciplines.

It will play home to the university’s departments of biology, chemistry, and biochemistry, as well as resources and programs in marine science, forensic science, allied health, and environmental science. Its labs and research spaces were designed to support interdisciplinary collaboration and discovery, the news release reports.

University President Teresa Abi-Nader Dahlberg said that the facility will serve as the “centerpiece and catalyst in the University’s growing prominence in science education and research,” the news release reports. She also described the complexities of installing the specialized equipment necessary for modern research, including sophisticated instrumentation, aquariums, and labs that will house “sea horses, algae, sea slugs, cell cultures, crabs, and zebra fish.”

The building is named in honor of Dr. Stephen F. and Marsha Dickey, who also provided what Marsha Dickey called a “family generational gift” toward the facility’s construction. The existing Dickey Health Center on campus is also named after them.

The university gathered input from faculty, students, and donors during the building’s design, according to Scott Gossen, assistant vice president of design, construction, and facilities. The Dickey Science Innovation Center will also be the twelfth building on campus to achieve LEED certification.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • College of the Desert Hits Construction Milestone on New Campus

    College of the Desert recently announced that the construction of its new Palm Springs Campus in Palm Springs, Calif., recently reached a major construction milestone, according to a news release. The college is partnering with general contractor C.W. Driver Companies, which recently “topped out” the facility by placing the final beam in its structure.

  • Chicago District Completes Construction on New Elementary School

    North Chicago School District 187 in North Chicago, Ill., recently held a ribbon-cutting ceremony for the new Forrestal Elementary School, according to a news release. The new school marks a major investment in military-connected students and families at Naval Station Great Lakes.

  • Minnesota District Starts Construction on Early Childhood Learning Center

    Sauk Rapids-Rice Public Schools in Sauk Rapids, Minn., recently announced that construction has begun on a new early childhood learning center and a new outdoor activities complex, according to a news release.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.