Embry-Riddle Completes Construction on Research, Lab Facility

Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer. The university partnered with ikon.5 architects as the project’s lead designer and with Hoar Construction for construction services.

The 35,000-square-foot facility contains specialized laboratory space that can simulate space and atmospheric conditions, the news release reports; it also features a clean room to sterilize equipment for space operations.

“CAT II is a great example of how thoughtful planning and collaboration can bring highly technical spaces to life,” said Erika Charlassier, Hoar Construction project manager. “From advanced laboratories to the sterilization room, every element of this facility was built to support innovation. Our team worked closely with Embry-Riddle to safely navigate complex conditions while maintaining schedule and budget, delivering a space that will help shape the future of aerospace research and education.”

The construction process took into consideration student planes frequently taking off and landing from the nearby Daytona Beach International Airport. Hoar Construction worked with the university to ensure the placement of equipment like cranes, boom pumps, and forklifts never exceeded the height of the building itself to keep airspace clear.

Hoar previously partnered with Embry-Riddle on the construction of a 239,172-square-foot, four-story parking garage including office space on the ground floor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Vanderbilt to Partner with ABM for Campus Preservation and Modernization

    Vanderbilt University recently announced that it has selected ABM Performance Solutions for a preservation and modernization project at its New York City campus, according to a news release. ABM will deliver its end-to-end ABM Performance Solutions (APS) model to manage critical operations during renovation and maintenance.

  • Miami University Approves New $242M Multipurpose Arena

    Miami University in Oxford, Ohio, recently announced that its Board of Trustees has approved construction of a new multipurpose arena at Cook Field, according to university news. The $242-million project will serve as a new centralized hub for student life and create space for economic development on campus.

  • Pitzer College

    Designing for Change in Higher Ed Learning Environments

    Higher education will continue to evolve, and learning environments must evolve with it. By prioritizing adaptable infrastructure, thoughtful reuse, strong energy performance, and wellness-centered design, campuses can create spaces that support learning today while remaining flexible for the future.

  • Harvard Announces Replacement Facility for Native American Program

    Harvard University in Cambridge, Mass., recently announced that construction will begin this spring on a new home for its Native American Program, according to university news. The 6,500-square-foot, all-electric building will stand three stories and serve as the central hub for the Harvard University Native American Program (HUNAP).