Embry-Riddle Completes Construction on Research, Lab Facility

Embry-Riddle Aeronautical University (ERAU) in Daytona Beach, Fla., recently announced the end of construction on a new research and lab facility on campus. The Center for Aerospace Engineering II (CAT II) will support aerospace research and technology development and broke ground last summer. The university partnered with ikon.5 architects as the project’s lead designer and with Hoar Construction for construction services.

The 35,000-square-foot facility contains specialized laboratory space that can simulate space and atmospheric conditions, the news release reports; it also features a clean room to sterilize equipment for space operations.

“CAT II is a great example of how thoughtful planning and collaboration can bring highly technical spaces to life,” said Erika Charlassier, Hoar Construction project manager. “From advanced laboratories to the sterilization room, every element of this facility was built to support innovation. Our team worked closely with Embry-Riddle to safely navigate complex conditions while maintaining schedule and budget, delivering a space that will help shape the future of aerospace research and education.”

The construction process took into consideration student planes frequently taking off and landing from the nearby Daytona Beach International Airport. Hoar Construction worked with the university to ensure the placement of equipment like cranes, boom pumps, and forklifts never exceeded the height of the building itself to keep airspace clear.

Hoar previously partnered with Embry-Riddle on the construction of a 239,172-square-foot, four-story parking garage including office space on the ground floor.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Rethinking K-12 Schools as a Continuous Learning Experience

    Most students move through three or more separate facilities during their K-12 journey, yet the built environments they encounter at each stage have traditionally been designed in isolation, with little continuity in spatial language, learning philosophy, or physical resources. Each new school is a reset with different layouts, learning models, expectations, and ways of moving through a building. The next generation of school design is making the case that the first day of kindergarten and the last day of high school can and should feel connected through common support systems and infrastructure in the physical environment.

  • Texas A&M Opens First Building at Fort Worth Campus, Breaks Ground on Research Facility

    The Texas A&M University System marked a major milestone in the development of its Fort Worth campus by opening its first completed academic building and breaking ground on a second facility designed to expand research and industry collaboration.

  • Minnesota District Converts Middle School into Community Hub

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced the end of a major renovation project that converted a former middle school into a new centralized district and community hub, according to a news release.