URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank. The new facility is part of a larger, $300-million, multiphase revitalization project for the entire campus.

The facility measures 32,000 square feet, and construction started in March 2024. Major building features include a two-story, high-bay staging area; a test tank measuring 20 feet wide, 30 feet long, and 15 feet deep; eight faculty research labs on the first floor; eight secondary lab spaces for shared or individual use; two shops with mechanical equipment like milling machines, sanders, band saws, and a lathe; faculty office space; and an incubator suite, according to the university website.

“This is a major milestone in the revitalization of this campus,” said University President Marc Parlange. “This campus is truly a hub for the blue economy in Rhode Island, with education, with research, with training, with extension, and partnerships with industry, as well as state and federal agencies. I am so grateful for the support of our state and federal elected officials and generous donors who make this transformation possible.”

About $145 million in funding came from two bond referenda approved by Rhode Island voters.

“The people who will work in the Ocean Robotics Laboratory are building the robots and instruments that are needed to solve challenges by giving them shared space, innovative infrastructure, and place-based partnership opportunity,” said Steve D'Hondt, the Graduate School of Oceanography’s interim dean. “The facility will enable Rhode Island to take a commanding global lead in robotic ocean exploration and automated sensing of the ocean.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Deferred Maintenance Issues Growing at Universities, Gordian Reports

    U.S. colleges and universities are falling increasingly behind on facilities maintenance and repair, according to Gordian’s 13th annual State of Facilities in Higher Education report. The deferred capital renewal burden has reached $156 per gross square foot, an 8% increase over the previous year.

  • abstract illustration of school gym

    How the Gymnasium Can Serve as a Model for Learning Space Design

    Multipurpose gyms work because flexibility was built into the brief from the start, not retrofitted later. The same logic applies to academic spaces.

  • St. John Fisher University

    Classroom Revitalization – Basil Hall Room 216

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. St. John Fisher University's Basil Hall Room 216 Classroom Revitalization has been recognized with an EDS 2026 Project of Distinction award in the category of Spaces.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.