URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank. The new facility is part of a larger, $300-million, multiphase revitalization project for the entire campus.

The facility measures 32,000 square feet, and construction started in March 2024. Major building features include a two-story, high-bay staging area; a test tank measuring 20 feet wide, 30 feet long, and 15 feet deep; eight faculty research labs on the first floor; eight secondary lab spaces for shared or individual use; two shops with mechanical equipment like milling machines, sanders, band saws, and a lathe; faculty office space; and an incubator suite, according to the university website.

“This is a major milestone in the revitalization of this campus,” said University President Marc Parlange. “This campus is truly a hub for the blue economy in Rhode Island, with education, with research, with training, with extension, and partnerships with industry, as well as state and federal agencies. I am so grateful for the support of our state and federal elected officials and generous donors who make this transformation possible.”

About $145 million in funding came from two bond referenda approved by Rhode Island voters.

“The people who will work in the Ocean Robotics Laboratory are building the robots and instruments that are needed to solve challenges by giving them shared space, innovative infrastructure, and place-based partnership opportunity,” said Steve D'Hondt, the Graduate School of Oceanography’s interim dean. “The facility will enable Rhode Island to take a commanding global lead in robotic ocean exploration and automated sensing of the ocean.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • California District Opens New Robotics Center

    The Fremont Union High School District (FUHSD) in Cupertino, Calif., recently held a Grand Opening ceremony for a new, district-wide Robotics Center, according to a news release. The 14,500-square-foot facility was designed by Quattrocchi Kwok Architects (QKA); Landmark Constructors served as the builder and Blach Construction as general construction manager.

  • DLR Group Announces New Mid-Atlantic Higher Education Leader

    Integrated design firm DLR Group recently announced that it has promoted Principal Shawn Gaither, AIA, LEED AP, to the role of higher education leader in the Mid-Atlantic, according to a news release. Gaither has served with the firm for more than 20 years, most recently as the national higher education business development leader.