Missouri K–12 District Cuts Ribbons on Two New Middle Schools

Springfield Public Schools in Springfield, Mo., recently celebrated the completion of two new middle school facilities with ribbon-cutting ceremonies, according to a district news release. The district officially opened the new Pipkin Middle School and Reed Academy on Sept. 3, both of which were funded through the $220-million Proposition S bond program approved by voters in 2023.

The new Pipkin Middle School measures about 114,750 square feet and replaces a 101-year-old facility located about a quarter-mile away. The district partnered with Paragon Architecture for the school’s design and Crossland Construction for construction. The project had a budget of about $53.1 million, local news reports.

Designed to serve students in grades 6–8, the new facility includes core classrooms, science labs, collaboration areas, flexible program space, and dedicated areas for special education. Pipkin is also an International Baccalaureate World School. Other amenities include spaces for choir, orchestra and band, as well as a gymnasium, weight room and multipurpose space.

Reed Academy, meanwhile, replaces the school’s previous century-old building on North Lyon Avenue. The roughly 128,900-square-foot facility was designed by Sapp Design Associates and built by DeWitt & Associates. The project had a budget of about $59.5 million.

Reed serves grades 6–8 with a focus on fine and performing arts. The new building includes 21 core classrooms, six science combination labs, two collaboration spaces and about 23,620 square feet dedicated to performing arts education. Specialized spaces support choir, world dance, band and orchestra, while a multipurpose auditorium provides a stage, sound booth and seating for about 450 people.

“These aren’t just new buildings; it's a massive step forward,” said Superintendent Dr. Grenita Lathan. “We now have bright, flexible learning spaces, advanced safety and security and fully accessible facilities designed for every single student.”

Both projects are part of the district’s broader Proposition S facilities improvement program.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • UPenn Announces Completion of New Veterinary Education Facility

    The University of Pennsylvania in Philadelphia, Penn., recently finished construction on an 11,800-square-foot veterinary education building, according to a news release. The Gail P. Riepe Center for Advanced Veterinary Education is the first dedicated classroom facility at the New Bolton Center, a large-animal hospital and campus about 35 miles west of the campus proper.

  • UT-San Antonio Begins Residence Hall Renovations

    The University of Texas at San Antonio recently began a $6-million renovation project to one of its residence halls, according to a news release. Originally completed in 1986, Chisolm Hall measures in at 120,860 square feet and is the oldest and largest residence hall on campus.

  • Wold Completes Geothermal Projects at Two Minnesota Schools

    Wold Architects & Engineers recently announced that it has completed two geothermal expansion projects for Mounds View Public Schools in Shoreview, Minn., according to a news release. The work at Highview Middle School and Irondale High School serves the district’s long-term goal of reducing energy costs and dependency on non-renewable fuel sources, as well as improving building performance.

  • Wenger Names New Vice President of Sales for Performing Arts, Controls

    Wenger Corporation, which provides products and solutions for music and theater education, performing arts and athletic storage, recently announced the hiring of a new Vice President of Sales for Performing Arts and Controls.