Construction Begins on 100+ Acre K–12 Campus Designed for Lakota Culture

The Cheyenne River Sioux Tribe (CRST) and the Cheyenne-Eagle Butte School District in Eagle Butte, S.D., recently broke ground on a new K–12 campus that will cover more than 100 acres and serve students and families across 1,600 square miles, according to a news release. The district partnered with Wold Architects & Engineers on the facility, which was designed to honor Lakota culture.

The project will include a 331,000-square-foot academic facility, student dorms, staff quarters, outdoor recreation and athletic facilities, and bus and maintenance spaces. The first phase of the multi-phase construction process is scheduled to begin in early 2027.

“The Cheyenne-Eagle Butte School represents something truly unique in our portfolio,” said Valerie Peterson, AIA, LEED AP, Wold Education Practice Leader. “Our role has been to listen to CRST tribal leaders, educators, students and families and to translate what we heard into spaces that honor Lakota culture and identity. Wold has spent years alongside the CRST and the school district advocating for the resources this community needs to see a project of this scale and significance through. It's a privilege to assist in that investment and to be trusted with a project this transformative.”

The campus will have the capacity for about 1,326 students and comply with Bureau of Indian Education (BIE) requirements while incorporating dedicated Lakota Language and Culture rooms, as well as a ceremonial outdoor-learning courtyard. Extracurricular amenities will include an auditorium seating 1,000, a gymnasium seating about 2,600, and football and track facilities.

According to the news release, the Bureau of Indian Affairs (BIA) selected the proposed project in 2021 as one of two to receive funding through the Great American Outdoors Act. The goal is to upgrade outdated facilities with a more modern campus and address recent enrollment growth.

“This is a rare opportunity for our students and our Tribe, and we have to get it right,” said CRST Tribal Projects Director Lyle Smith. “The design team helped us work through a complicated process and find practical solutions that met the requirements, prioritized our needs and could be maintained here. This campus will serve our students and the Tribe for many years.”

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Virginia Tech Tops Out New College of Engineering Building

    Virginia Tech in Blacksburg, Va., recently celebrated the topping out of Mitchell Hall, which will soon stand as the largest College of Engineering building on campus, according to a news release. The university partnered with Skanska on the 285,500-square-foot facility, which has an expected completion date of winter 2028.

  • St. Lucie County, Fla., Breaks Ground on New K–8 School

    St. Lucie Public Schools in St. Lucie County, Fla., recently held a groundbreaking ceremony for a new K–8 school, according to a news release. The district partnered with Spiezle Architectural Group, Inc., for the design of the upcoming Ft. Pierce K–8 School, which comprises six buildings covering 215,000 square feet.

  • Wyoming District Breaks Ground on New Elementary School

    Laramie County School District #1 in Cheyenne, Wy., recently held a groundbreaking ceremony for the upcoming Mountain View Elementary School, according to a news release. The facility has an estimated completion date of summer 2028, and it will have the capacity for 650 students in fifth and sixth grade.

  • URI Cuts Underwater Ribbon on New Ocean Robotics Laboratory

    The University of Rhode Island recently held a ribbon-cutting ceremony for a new Ocean Robotics Laboratory at its Narragansett Bay Campus, according to a news release. Two students used a remotely operated vehicle to cut an underwater ribbon in a 30-by-20-foot test tank.