How Inflation, Experience Gaps, and AI Are Reshaping Education Construction and Cost Control

Scott Creekmore, VP of Customer Engagement at Gordian, explains how Gordian evolved from Job Order Contracting into planning tools for facility condition assessments and asset recapture, plus estimating through RSMeans price data. He outlines major challenges facing education construction today: rapid inflation driven by geopolitics, an industry-wide experience gap as seasoned professionals retire without enough backfill, and resulting cost-control volatility where prices swing dramatically over short periods. Creekmore describes how advancing technology—especially AI—along with CMMS and cost-tracking software can help agencies do more with less by improving scope detail, reducing change orders, tracking labor on site, and enhancing cost benchmarking and predictive insights, including regional price differences. He also advocates for longer-term planning, economies of scale, and reexamining procurement laws and options such as cooperative purchasing and job order contracting to improve cost control.

00:00 Meet Scott and Gordian
00:22 Gordian Origins and Services
01:14 Industry Challenges Today
03:14 Tech Trends and AI Tools
05:11 AI for Better Scopes
07:42 Long Term Planning in Education
09:22 Smarter Procurement and Cost Control
10:05 Closing Thoughts

Additional resources:

Sponsored by Gordian

Featured

  • Baton Rouge Center for Visual and Performing Arts

    Baton Rouge Center for Visual and Performing Arts

    Established in 1999, the Education Design Showcase is a vehicle for showing off innovative — yet practical — solutions in planning, design, architecture, and construction. The Baton Rouge Center for Visual and Performing Arts has been recognized with an EDS 2026 Project of Distinction award in the category of New Construction.

  • Secret to Efficient, On-Time School Infrastructure & Modernization Projects is All in the Preparation

    Warmer weather and longer days make summer the ideal time for construction and modernization projects at educational facilities. School boards and construction firms must coordinate effectively to ensure that these projects do not extend even a single day into the school year and impede classroom operation.

  • Girl Sitting at Library Desk, Using Laptop

    How Campus Design Shapes the Finals Week Experience

    Academic performance is not just about preparation. It is closely tied to how students manage stress, maintain their energy, and shift between work and recovery modes. Much of that is influenced, directly or indirectly, by design.

  • Florida District Completes Construction on New Leadership Institute

    Pinellas County Schools near Tampa, Fla., recently announced that construction is complete on the new Dr. Michael A. Grego Leadership Institute, according to a news release. The district partnered with Rowe Architects for the project’s design and with Skanska for construction services.