LACCD Holds Groundbreaking for $40M Student Services Building

The Los Angeles Community College District (LACCD) held a groundbreaking ceremony last week for the new $40-million student services building at Los Angeles Mission College. The event, which was livestreamed on YouTube and Facebook on Thursday, April 15, was the first in-person event for LACCD since the beginning of the coronavirus pandemic.

Attendees included members of the LACCD Board of Trustees, the Chancellor, the Los Angeles Mission College community, and other district officials. Featured speakers included LACCD Board President Steven F. Veres, LACCD Chancellor Francisco C. Rodriguez, Ph.D., and Mission College President Monte E. Perez.

The new Student Services & Administration Building will consist of three stories and cover 59,000 square feet. It will house student services like admissions, financial aid, and other administrative offices. The building was designed and placed to serve as a gateway to the campus, both physically and metaphorically. It will follow LEED Gold technology standards and include sustainability efforts like drought-tolerant landscaping, green-roof technology to minimize use of HVAC systems, and 66 kWh of solar panels.

Los Angeles Mission College is one of nine schools included in the LACCD system. The construction is part of the district’s “BuildLACCD” initiative, a $9.6 billion capital improvement plan that has seen more than 700 projects completed to date. The Student Services & Administration Building is also the first project of the initiative to be funded entirely from the $3.3 billion in “Measure CC” bond funds that voters approved in 2016.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • blurry image capturing students navigating crowded hallways between classes

    How Human Behavior Data Is Reshaping Campus Facilities Management

    The ebb and flow of students, faculty, and administrators across a campus have a larger impact on maintenance, cleaning, and sustainability than many realize.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Massachusetts K–12 District Selects Architect for New Junior High

    Swansea Public Schools in Swansea, Mass., recently announced that it has selected Finegold Alexander Architects to design a new junior high school for the district, according to a news release. The firm will create the Feasibility Study and Schematic Design for Joseph Case Junior High School after a lengthy selection process by the Massachusetts School Building Authority (MSBA).

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.