Seats Highlight of Theatre Renovation

Theatre Seats

Wenger seating brings great comfort and an improved viewing experience to patrons and scholars at the Folger Shakespeare Library and Theatre.

“It was very important to us that our new chairs reflected the room’s inherent aesthetics and acknowledged its history,” explains Beth Emelson, assistant artistic producer with the Folger Shakespeare Library and Folger Theatre in Washington, DC.

Opened in 1932, the Folger is a world-renowned research center on Shakespeare that offers plays, concerts and educational activities for school groups, scholars and tourists alike.

After 20 years of heavy use, the previous seats were starting to fail. The upholstery was tearing; loose springs and nuts rattled noisily. New seats were the centerpieces of general renovations that carefully respected and preserved the Folger’s historic status.

The facility’s design is based on Elizabethan inn yard theatres, with a main seating area flanked by two side galleries and a balcony above. Fixed seats were installed on the main floor, with portable chairs used in the galleries and balcony.

All the Wenger seating is earning rave reviews from Folger staff and audiences alike. “Audiences have reacted very positively to the new chairs — people are really enjoying them,” says Tim Guillot, audience services coordinator.

The side galleries have two rows of chairs; during the planning process the Folger staff tried Portable Audience Chairs of different heights in order to create optimal sight lines over the balcony railings.

For the first row, 32-inch chairs were selected; second-row chairs are two inches higher. “People in the second row don’t realize their chairs are taller, enabling them to see more easily,” says Emelson.

Aesthetically, the Portable Audience Chairs mimic the fixed seats’ wood tone in the arms and seat bottoms, along with the upholstery. Emelson believes the two chair models look like they belong together.

Overall, she praises her terrific experience working with Wenger each step of the way. “Everyone on their team was responsive and understanding of our tight timeline,” Emelson concludes. “We trusted Wenger and they delivered!”

www.wengercorp.com

This article originally appeared in the issue of .

Featured

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • Full Sail University Announces First Student Housing Facility

    Full Sail University in Winter Park, Fla., recently announced that development has begun on its first student housing community, according to a news release. The university is partnering with Nvision Development for construction and long-term management of the facility, which will stand five stories and have the capacity for more than 570 beds.

  • Wisconsin District Breaks Ground on New Elementary School

    The School District of La Crosse in La Crosse, Wis., recently broke ground on a new elementary school that will consolidate the students and staff of two existing schools, according to local news. Funding for the school comes from a $53-million referendum approved in 2024.