University of Western Ontario

Project Snapshot

PROJECT: Paul Davenport Theater
INSTITUTION: University of Western Ontario
LOCATION: London, ON, Canada
COMPANY NAME: Wenger
WEBSITE: www.wengercorp.com

THE CHALLENGE

The University of Western Ontario (UWO) offers 400 specializations, majors and minors to 36,000-plus students. When planning the renovation of UWO’s Talbot Theatre, faculty goals included better sound for a range of performances and sound levels that were less overpowering.

University of Western Ontario

University of Western Ontario

UWO selected a full-stage acoustical shell as a key element of a theatre renovation designed to improve acoustics.

THE SOLUTION

Additional cubic volume was needed to improve reverberance, so UWO enlarged the space by demolishing a floor of classrooms above the theatre. This raised the ceiling and increased the room’s volume by 33 percent. As part of this renovation, a Diva® full-stage acoustical shell was installed; its towers and ceiling panels were manufactured to satisfy specific acoustical requirements.

The shell’s design accounted for the shallow stage depth, which squeezed the available space for freestanding acoustical towers. The three rear towers were attached to the stage’s back wall, with three movable towers on each side.

The ceiling panels, or clouds, consist of four rows of five panels each. Openings between the panels allow some sound to escape, and the ability to fine-tune each panel’s angle is another advantage. Operationally, two primary shell setups are used regularly: the full shell for large ensembles, or six towers arranged in an arc — using half the clouds — for smaller concerts or recitals. A four- to five-person crew can set up the shell from its storage position and then strike it back into its storage position in approximately four hours. With the patented, electric-powered Air Transporter, one person can easily move a 1,350-pound tower.

Visually, this Diva shell complements the aesthetics of the renovated auditorium, which was renamed the Paul Davenport Theatre. Birchwood is featured on many auditorium finishes, including the proscenium arch and Diva shell, which features a warm-looking birch veneer.

IMPACT ON LEARNING

A main goal of the project — for student musicians to fully realize the benefits of their rehearsals — is realized through the use of improved acoustics. In UWO’s larger renovated space, the Diva shell creates a “blending chamber” for sound on stage, improving communication among musicians and their director.

“As a musician performing in the hall, the most important thing is the supportive environment and inspiration that comes with the warmth and presence,” comments Stéphan Sylvestre, assistant professor of piano and Keyboard Division coordinator. “As an audience member, there’s definitely much better clarity and sound projection.”

Editor's Review

For all students, but particularly for music students, the acoustics of their learning spaces matter. Good acoustic design results from careful manipulation of two factors: initial time delay and reverberation time. Reverberation time is related to the volume (size) of the room and the noise absorption of its surfaces. With close attention paid to these factors in the renovation of what is now the Paul Davenport Theater, the result is a much-improved, acoustically ideal space that will allow music professors to teach and students to learn, rehearse and perform at a higher level than before the renovation.

This article originally appeared in the issue of .

Featured

  • textured paper collage shows a school building on fire as a fire truck sprays water into the flames

    Why a Fire Loss Is More than Flames

    We've all seen what fire damage can do to a property, but the types of damage building owners often encounter after a fire loss can exceed expectations. Having full awareness of the different forms of damage properties can sustain helps owners respond faster, reduce continued damage, and get back on the road to recovery in short order.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • ClassVR headsets

    Avantis Education Revamps Hardware for ClassVR Solution

    Avantis Education recently announced the launch of two new headsets for its flagship educational VR/AR solution, ClassVR. According to a news release, the Xcelerate and Xplorer headsets expand the company’s offerings into higher education while continuing to meet the evolving needs of K–12 users.

  • Pudu Robotics Launches AI-Powered, Large-Scale Floor Sweeper

    Pudu Robotics recently launched the newest member of its MT1 series of robotic floor sweepers, the PUDU MT1 Max, according to a news release. The AI-powered, 3D perception robotic sweeper was designed for use in large, complex cleaning environments both indoors and semi-outdoors, like parking garages and semi-open building atriums.

Digital Edition