Tidewater Community College: Joint-Use Library

The 120,000-square-foot Joint-Use Library in Virginia Beach, VA, operated jointly by Tidewater Community College (TCC) and the City of Virginia Beach, is affectionately referred to as “the jewel.” The awe-inspiring structure, which houses more than 128,000 items ranging from bestsellers to college textbooks, features soaring staircases, a two-story atrium, colorful wall hangings, comfy furnishings and plenty of natural light.

Tidewater Community College: Joint-Use Library

PHOTOS COURTESY OF TIDEWATER COMMUNITY COLLEGE / VISUAL COMMUNICATIONS DEPARTMENT and CRAIG MCCLURE / CITY OF VIRGINIA BEACH

Opened in August 2013, the Joint-Use Library represents a rare collaboration between an institution of higher education and a municipality. TCC and the City of Virginia Beach partnered to build the $43 million library, with 80 percent of the funding coming from the college and 20 percent from the city.

TCC is the largest provider of higher education and workforce solutions in southeastern Virginia, and the iconic library sits on the largest of TCC’s four campuses. Students and city residents enjoy the full scope of the library’s offerings, which include 360 computers, free WiFi, a dynamic children’s room, collaborative workspaces, a café and numerous private study rooms.

“The Joint-Use Library is a shining example of the entrepreneurial efforts by Tidewater Community College, and a jewel to the students at TCC and to the residents of Virginia Beach,” TCC President Edna V. Baehre- Kolovani says. “This partnership is an unparalleled resource that will benefit the Hampton Roads community for decades to come.”

RRMM Architects of Norfolk, VA, teamed with two California firms, Carrier Johnson of San Diego, nationally known for library designs, and Anderson Brule of San Jose, specialists in joint-use libraries. The project achieved LEED Gold certification. Environmentally responsible elements include motorized window shades, floor openings designed to enhance the use of natural light, advanced stormwater management techniques using bio-retention ponds and large open spaces, and glass walls to provide scenic exterior views for more than 90 percent of interior spaces.

This article originally appeared in the issue of .

Featured

  • Spaces4Learning Trends & Predictions for Educational Facilities in 2026: Part I

    We asked, you answered, and the results are in! Last year, we put out a call for submissions to collect our readership’s opinion on trends and predictions for K–12 and higher education facilities in 2026.

  • New Arizona Fine Arts School Reaches Construction Milestone

    Construction of the new Hilltop School for the Arts and Theater in Litchfield Park, Ariz., recently hit a significant milestone, according to a news release. The Agua Fria High School District held a beam-signing ceremony to celebrate the building’s topping out, or the placement of its last structural beam.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • Ohio State University Opens 26-Story Hospital

    The Ohio State University Wexner Medical Center recently opened in Columbus, Ohio, standing 26 stories and covering 1.9 million square feet, according to a university news release. The project marks ten years of effort and is the university’s largest single-facility construction project ever.