Tidewater Community College: Joint-Use Library

The 120,000-square-foot Joint-Use Library in Virginia Beach, VA, operated jointly by Tidewater Community College (TCC) and the City of Virginia Beach, is affectionately referred to as “the jewel.” The awe-inspiring structure, which houses more than 128,000 items ranging from bestsellers to college textbooks, features soaring staircases, a two-story atrium, colorful wall hangings, comfy furnishings and plenty of natural light.

Tidewater Community College: Joint-Use Library

PHOTOS COURTESY OF TIDEWATER COMMUNITY COLLEGE / VISUAL COMMUNICATIONS DEPARTMENT and CRAIG MCCLURE / CITY OF VIRGINIA BEACH

Opened in August 2013, the Joint-Use Library represents a rare collaboration between an institution of higher education and a municipality. TCC and the City of Virginia Beach partnered to build the $43 million library, with 80 percent of the funding coming from the college and 20 percent from the city.

TCC is the largest provider of higher education and workforce solutions in southeastern Virginia, and the iconic library sits on the largest of TCC’s four campuses. Students and city residents enjoy the full scope of the library’s offerings, which include 360 computers, free WiFi, a dynamic children’s room, collaborative workspaces, a café and numerous private study rooms.

“The Joint-Use Library is a shining example of the entrepreneurial efforts by Tidewater Community College, and a jewel to the students at TCC and to the residents of Virginia Beach,” TCC President Edna V. Baehre- Kolovani says. “This partnership is an unparalleled resource that will benefit the Hampton Roads community for decades to come.”

RRMM Architects of Norfolk, VA, teamed with two California firms, Carrier Johnson of San Diego, nationally known for library designs, and Anderson Brule of San Jose, specialists in joint-use libraries. The project achieved LEED Gold certification. Environmentally responsible elements include motorized window shades, floor openings designed to enhance the use of natural light, advanced stormwater management techniques using bio-retention ponds and large open spaces, and glass walls to provide scenic exterior views for more than 90 percent of interior spaces.

This article originally appeared in the issue of .

Featured

  • GeoCam and UCLA: Modernizing Campus Accessibility Mapping

    In early 2025, UCLA partnered with GeoCam to capture and modernize its pedestrian infrastructure data. The goal was ambitious but clear: to produce a high-accuracy, imagery-backed digital map of every sidewalk, pathway, ramp, and ADA-related feature on UCLA’s 419-acre campus.

  • Classical building columns display digital data streams

    The Campus Nervous System: Why Facilities Risk Is Now a Leadership Issue in Higher Education

    Facility performance now intersects with safety, compliance, on-campus experience, institutional reputation, and financial resilience. That places it firmly on the leadership agenda.

  • Washington State District Breaks Ground on New Elementary School

    Cheney School District No. 360 in Spokane County, Wash., recently announced that construction has begun on a new elementary school, according to local news. The district held a groundbreaking ceremony on May 18 in Airway Heights for the yet-to-be-named school, which is scheduled to open in fall 2027.

  • Year-Round Schools Require Year-Round Indoor Air Quality Planning

    While many schools are out for the summer, year-round schools follow a more “balanced” schedule with shorter, more frequent breaks spaced throughout the school year. Even though this offers educational benefits, these facilities have less downtime for building maintenance. This can become an issue when facilities managers overlook the importance of routine HVAC maintenance and air duct cleaning services.