Grant Wood Elementary School Construction Underway

Grant Wood ElementaryConstruction has begun on Grant Wood Elementary School, which will replace a 57-year-old facility of the same name. The old Grant Wood was dark and operationally inefficient, plus it had severe space shortages that restricted the curriculum and limited community use.

The 62,500-square-foot replacement school is nearly 70 percent larger than the previous facility. It allows an increase from two to three sections and is designed to hold 450+ students (100 more than the old school).

Designed by Legat Architects and to be built by Estes Construction, the new Grant Wood incorporates 21st-century learning concepts into a more traditional school design. Among its features are multipurpose areas, an “Innovation Spine,” a 3,100-square foot student commons, and an energy-efficient HVAC system.

“The design of the new elementary school provides much-needed improvements in learning areas for all students,” said John Cain, principal of Grant Wood. “Classrooms are significantly larger, breakout areas are located throughout the building and large areas have been designed for small group work as well as adult learning.”

Construction started in July, 2017. The school will open in August, 2018 and the project will be completed in November, 2018. The new school is getting built behind the old school. When construction finishes, the old school will be demolished for adequate parking and green space.

The glass Innovation Spine, located at the heart of the school, separates the grades 1-5 and PK-K wings and fills the corridor with natural light. Spaces within the spine include the commons, cafeteria, learning stair, library, and a STEM makerspace.

The learning stair (off the entry) welcomes spontaneous gathering and presentations, and leads to the lower level commons/cafeteria. The first floor makerspace supports robot building, hands-on science, and learning through discovery. It offers work areas with device plug-in, markerboard tables, and writeable wall space.

The combined cafeteria/gymnasium in the old school created scheduling conflicts and restricted community use. The new Grant Wood has a separate cafeteria and a gym nearly twice as large as the old one. This not only expands the PE program, but also welcomes community recreation programs.

The Legat design team is exploring ways to integrate the work of the school’s namesake, an Iowa native and a renowned artist, into the project. Ideas include using the color palette of his paintings and adding digitized versions of his paintings as a layer to glass and wall surfaces.

Cain says, “The new Grant Wood will stand as a flexible community resource with collaboration and discovery at its core.”

Featured

  • Construction Begins on New University Research Vessel

    Boat-building company All American Marine recently announced that it has begun construction on a new catamaran research vessel for the University of Texas Marine Science Institute (UTMSI) in Port Aransas, Texas, according to a news release.

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • From Approval to Opening: Inside Travis Unified School District’s Fast Tracked Campus Expansion

    The Travis Unified School District (TUSD) in northern California includes several elementary and high schools serving over 5,400 students. In 2024, the TUSD Board approved the addition of sixth grade to the Golden West Middle School campus for the 2025–26 school year, setting in motion an accelerated effort to bring new facilities online in less than a year.

  • Children walking along bright school corridor with motion blur

    How Next-Gen Design Is Reshaping the Student Experience

    The environments where students learn play a crucial role in shaping their growth in and out of the classroom. By centering design on well-being, flexibility, and purpose, districts can ensure their facilities remain vibrant community assets for many years to come.