Round Rock ISD Completes New Early College High School

Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500. The project broke ground in April 2024 and opened to students for the current semester.

The district partnered with program management firm HPM for the entire project. It also partnered with Bartlett Cocke as general contractor, O’Connell Robertson as architect, and Rabaa Kistner as the Geotech and construction materials testing consultant, the news release reports.

Campus amenities include academic classrooms, study rooms and lab spaces, a large commons area, a cafeteria featuring a 12x8-foot video wall, outdoor dining and study areas, and an administrative suite. The school offers a high-school and college-level curriculum, allowing students to graduate with both a high-school diploma and an associate’s degree.

“This facility represents more than just classrooms and labs. It’s a space where students can explore, grow and prepare for their futures,” said HPM’s senior manager of design and construction, Denish Sonani. “Collaborating with the Round Rock ISD to bring this vision to life reinforces our shared commitment to strengthening learning environments that serve students and the community for years to come.”

The project is part of the district’s 2018 voter-approved bond program to fund new construction, renovations, and infrastructure improvements around the district, according to the news release. HPM also partnered with the district for its 2024 bond program and is currently designing more than 15 associated projects.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Wold Architects & Engineers Acquires VPS Architecture

    Full-service planning, architecture, and engineering firm Wold Architects & Engineers recently announced that it has acquired VPS Architecture, according to a news release. The move will help strengthen Wold’s education and public-sector design expertise, industries in which both companies have strong pre-existing ties and relationships.

  • DFW-Area District Opens New Replacement Middle School

    The Eagle Mountain-Saginaw Independent School District near Fort Worth, Texas, recently held a ribbon-cutting ceremony for a new replacement middle school campus, according to a news release. The new facility for Wayside Middle School, originally established in 1964, was built on the site of the former district administration building and funded through Bond Proposition A in 2023.

  • LAN, Inc. Opens Office in College Station, Texas

    Lockwood, Andrews & Newnam, Inc. (LAN) recently announced the opening of a new office in College Station, Texas, to support its regional client base, according to a news release. The organization provides engineering, design, and program management services for water, wastewater, transportation, stormwater, and education clients in the Brazos Valley.

  • Photo credit - Chuck Coates

    Florida District Modernizes Central Energy Plants at Two High Schools

    Flagler Schools, a public school district in Flagler County, Fla., recently partnered with Matern Professional Engineering to modernize the central energy plants at two of its high schools, according to a news release. The project is part of a larger, district-wide effort to reduce energy costs and operational expenses.