Colorado State University Biology Building

Hord Coplan Macht

Project of Distinction 2017 Education Design Showcase

Colorado State University Biology Building

Project Information

Facility Use: 4-year Institution
Project Type: New Construction
Category: Laboratories/Research Facilities
Location: Fort Collins, CO
District/Inst.: Colorado State University
Chief Administrator: Tracey Abel
Completion Date: August 2017
Gross Area: 134,500 sq. ft.
Area Per Student: 63 sq. ft.
Site Size: 2.21 acres
Current Enrollment: 1,550 Undergrad/115 Graduate
Capacity: 1,800 students
Cost per Student: $38,888
Cost per Sq. Ft.: $456
Total Cost: $58,000,000

The new $58 million Biology Building on the Colorado State University (CSU) campus is a four-story, 154,000-square-foot teaching and research facility designed by Hord Coplan Macht. The firm recently completed both the Biology Building and a $41 million Chemistry Building. The two LEED Gold-certified buildings are the anchors of the growing CSU Science Commons and are adjacent to the future Health Education Outreach Center, which is also currently being designed by the firm.

Colorado State University Biology BuildingThe biology building was designed to house the CSU Biology Department, including research labs, special collections used for teaching, faculty offices and idea space for collaboration. A large portion of the building is also dedicated to classrooms, teaching labs, student common spaces, advising and tutoring offices, and study rooms. The biology department is the largest in the College of Natural Sciences at CSU, with more than 1,400 undergraduate students studying in the Biological Science or Zoology majors. The project was completed by a design-build delivery method with Hord Coplan Macht as architect and Haselden Construction as general contractor.

The biology and chemistry structures were built in tandem, utilizing different delivery methods, allowing both projects to minimize costs and create a thoughtful, new, unified Science Commons. The evolving CSU Science Commons includes bike and pedestrian paths, outdoor seating areas, native plant landscaping and an integrated storm water recapture system.

The new biology building provides opportunities for hands-on laboratory work for undergraduate students, both in class and in working with faculty members on their research. The “science on display” design of the building allows a view into the labs from the hallways through glass panels.

“It’s designed to foster more interaction,” says Mike Antolin, professor and chair of the Department of Biology, “and it has the flexibility to be able to meet unanticipated future needs.”

The new Science Commons showcases CSU’s dedication to providing a state-of-the-art science education to their students. All three buildings focus on providing open and adaptable laboratories for researchers and their teams. All of the labs are daylit, where appropriate, with views to the outside making the spaces ideal for science exploration.

Colorado State University Biology Building Colorado State University Biology Building

Judges Comments

The display walls are the strength of this project. The use of terrazzo is a good choice for both appearance and longevity. Nice use of materials.

Architect(s):

Hord Coplan Macht
JENNIFER CORDES
303/607-0977

Featured

  • Pittsburgh High School Upgrades Athletics Facilities’ Technology

    Plum Senior High School in Pittsburgh, Penn., recently partnered with South-Dakota-based Daktronics through the We’re All Mustangs Here Foundation to upgrade the technology in its athletics facilities, according to a news release. Daktronics designed, built, and installed new LED video displays and finished the project in time for the beginning of the 2025 high-school football season.

  • Epson Receives Seven AV Industry Awards

    Projectors manufacturer Epson recently announced that it received multiple awards across the Higher Ed AV Awards, SCN Stellar Service Awards, and InfoComm 2025, according to a news release. The company was recognized for three projectors from its PowerLite L-Series line, accessories, installation process, and its customer support team.

  • University of Southern Mississippi Starts Construction on Oyster Hatchery

    The University of Southern Mississippi (USM) recently announced that construction has begun on a new oyster hatchery at its Gulf Coast Research Laboratory (GCRL) Thad Cochran Marine Aquaculture Center (TCMAC) Cedar Point campus in Ocean Springs, Miss., according to a news release.

  • Texas K–12 District to Build New Elementary, High Schools

    The High Island Independent School District on the Bolivar Peninsula in Southeast Texas recently announced that construction on a new elementary school and a new high school will begin in January 2026, according to local news. Funding will come from a $27.9-million bond passed in May 2025.

Digital Edition