Preschool in Conn. Opens Makerspace

The United Methodist Preschool (UMPS) in New Canaan, CT recently held a public open house of their newly completed makerspace. The makerspace enhances their STEAM-based curriculum.

The makerspace provides children ages 3-5 with a space for making, learning, exploring, and sharing. “Through tinkering (using stuff), making (using stuff to make stuff), and engineering (using stuff to make stuff that does stuff), children are engaged in the same creative processes and actions that engineers and scientists use,” read a statement on the school’s website.

“The new space will enable the children to create, explore in-depth, and work on long-term projects,” UMPS board member Margaret Pastel told the New Canaan Advertiser. “This is unique as most preschool projects are often completed in one day and rarely returned to. In the Makerspace, children will construct, improve, dismantle, imagine and redesign long-term projects, fostering creativity and higher-level thinking skills.”

The preschool is the first preschool to receive accreditation through The National Association for the Education of Young Children.

About the Author

Yvonne Marquez is senior editor of Spaces4Learning. She can be reached at [email protected].

Featured

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • Niles West High School Natatorium Renovation

    Natatoriums are highly specialized spaces, and luminaires in this setting face several unique challenges. Perhaps the most significant is corrosion, which is exacerbated by high indoor humidity, condensation, and pool chemicals, often resulting in material degradation in luminaires not certified to perform in corrosive environments.

  • Upcoming University of Alabama Performing Arts Center Hits Construction Milestone

    The University of Alabama in Tuscaloosa, Ala., recently celebrated the topping out of its new Smith Family Center for Performing Arts, according to a news release. The university is partnering with HPM for program and project management on the facility, which broke ground in 2023 and is scheduled for completion in November 2026.

  • Abstract tech network data connections with orange, blue glowing dots, lines

    3 Trends for Higher Education to Stay Ahead of in 2026

    As universities enter the new year, the question is no longer whether digital transformation is necessary, but how quickly institutions can convert technological potential into strategic advantage.

Digital Edition