Small-Town Native to Fund $40M K–12 Renovation Project

The Winifred School, part of Winifred Public Schools in Winifred, Mont., is set to receive a series of high-tech upgrades and renovations that would double the school’s original size. Upgrades to the K–12 school will include lab spaces, a woodworking area, an agricultural science space, a car repair space, and a full-size gym featuring an indoor track.

The project is the initiative of Norman Asbjornson, who grew up in Winifred and went on to found HVAC company AAON, Inc. Asbjornson is funding the entire $40-million project himself and expressed a desire to give back to his hometown, which has a population of about 200.

“I’m more than capable financially of doing a significant contribution, and I said, ‘Well, if you’re committed to it, then I’ll dial in. And if we’re going to do it, we’re going to do it right,’” he said. “I am guiding it a little bit to the architect and type of school, and making sure everything that could be done to make an outstanding school in the state of Montana.”

The school is partnering with A&E Design on the project. The school’s new layout is meant to encourage collaboration and encourage an active learning environment with multidisciplinary work spaces. “The vision, particularly from Norman and the design team as a whole, is that we could start to see this level of education facility ripple throughout the state—that this will be a model for others to look to and say, ‘How do I accomplish that?’” said Dusty Eaton of A&E Design.

In May 2020, AAON’s Board of Directors donated $1.25 million to the Winifred Montana Public Schools District in honor of Asbjornson, to be used for the construction of a new K–12 public school building.

“The town is becoming a better town all the time, and it’s raising a lot more prime citizens for the future, who will hopefully someday return the favor to the town when they’re capable and continue to make Winifred and Montana a better town and a better state,” Asbjornson said.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Malibu High School Campus Completes $102M Phase 1 of Construction

    Malibu High School in Malibu, Calif., recently announced that it has completed phase 1 of construction for its new campus, a news release reports. The first phase consisted of developing and modernizing the site of a former elementary school into a new, 70,000-square-foot, two-story facility.

  • concentric silhouettes of a human head

    How Physical Space Shapes the Mind: Designing for Better Learning Outcomes

    Research in environmental psychology and neuroscience increasingly suggests that the way a room is designed can influence memory, focus, or even a student's sense of belonging.

  • University of West Florida Opens New Laboratory Facility

    The University of West Florida recently announced that renovation work is complete on a new lab building for its campus in Pensacola, Fla., according to university news. Building 80 will serve as the home to the university’s civil engineering program and the Tyler Chase Norwood Construction Management Program.

  • Beyond Four Walls

    Operable glass walls provide a dynamic solution for educational spaces. They align with today’s evolving teaching methods and adapt to the needs of modern learners. Beyond the functional versatility, movable glass walls offer clean, contemporary aesthetics, slim and unobtrusive profiles, and versatile configurations that cater to the evolving needs of students and educators alike.

Digital Edition