Northwestern State University Breaks Ground on New Academic Building

Northwestern State University in Natchitoches, La., recently celebrated a groundbreaking ceremony for a new academic building named after a former university president. Alost Hall will measure in at 73,200 square feet and feature multipurpose classrooms for a wide variety of academic disciplines, according to a university news release. The total cost of the project is $44 million.

“It is incredibly significant for everybody, and for students that are not even on campus yet, students who are not even born yet. They are going to benefit from this investment, so in a very real way, this groundbreaking is a testament to the work that we have all done collectively to invest again in higher education,” said Louisiana Gov. Jon Bel Edwards at the ceremony. “Education is the engine for economic growth and diversification. It is the key to opportunity and prosperity for everybody.”

Amenities in the new facility will include simulation laboratories for nursing and anesthesia programs; a clinic and training area for social work and psychology students; twelve 30-person classrooms; two 40-person classrooms; three 50-person classrooms; and space for 60 offices and an administrative office area, as well as a large conference room and reception area.

“Today, we gather to celebrate the start of a new chapter in the lift of our institution as we begin construction of the state-of-the-art building that will serve as the hub of innovation, collaboration, and learning for generations of students, faculty, and staff to come,” said NSU President Dr. Marcus Jones. “This groundbreaking is a testament to the unwavering commitment of excellence in education, research, and service to our community.”

Local news reports that the new facility will replace John S. Kyser Hall, the largest building on campus, which was built in 1968.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at mjones@1105media.com.

Featured

  • Designing a Performing Arts Center from a PE Perspective

    Designing a top-tier performing arts facility for a high school is a complex endeavor that demands a delicate balance between advanced technical specifications and practical budget considerations. Nevertheless, it represents a crucial initiative that enriches educational and community engagements.

  • Minnesota District Completes Major Renovations, Expansions to High School

    White Bear Lake Area Schools in White Bear Lake, Minn., recently announced that it has completed the renovation and expansion of White Bear Lake Area High School, according to a news release. The school’s final addition, a new 845-seat Performing Arts Center, was finished in November.

  • Integem Releases New AI-Powered AR Software Platform

    Integem recently announced the release of iPlayer EDU, an AI-powered software platform featuring augmented reality (AR) technology that allows teachers to create immersive educational experiences, according to a news release. The software also includes interactive lessons on a variety of subjects, including planets in the solar system.

  • bar graph with the bars made out of abstract cinder blocks and other construction materials

    Spaces4Learning 2025 Trends in K–12: Materials & Construction

    With 2025 well underway, it’s time to take a look at some broader trends submitted by you, our Spaces4Learning readership. We asked for your thoughts on topics like classroom design, health & safety, materials & construction, and technology in both K–12 and higher-education environments. Below is a roundup of 2025 trends in K–12 materials and construction from the experts in the trenches.