Wenger Launches LED Light Fixture

Music and theater education solutions company Wenger Corporation recently announced the launch of the Novara LED light fixture, according to a news release. The product was intentionally designed as a retrofit for Diva Acoustic Shells, allowing venues to upgrade light fixtures within those shells to save on electricity costs without replacing the entire setup.

The news release reports that Novara serves as the only LED fixture designed as a 1:1 replacement for incandescent fixtures installed in the existing Diva Acoustical Shells. The LED bulbs offer comparable beam angles and lumen output to provide shell lighting of performance spaces at a more sustainable cost.

Novara LED Fixture
Photo Courtesy of Wenger Corporation

The Novara LED fixture offers a brightness of 6,800 lumens to fully illuminate the venue’s stage area. The new fixtures are also silent, lacking any buzzing or humming noises that might distract from a performance. The energy-efficient bulbs exude minimal heat and no ultraviolet or infrared radiation. They can also save organizations up to 86% on electricity costs and consumption.

The fixtures are individually controllable and addressable using DMX/RDM or mains dimming technology. The two-axis beam positioning allows for easy adjustability and fine-tuning to tailor it to a given performance. The bulb also has a lifespan 35 times as long as its predecessor, reducing both maintenance times and replacement costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Illinois District Boosts Security at High-School Stadium

    Richmond-Burton Community High School in Richmond, Ill., recently announced that it has completed the redesigned entrance to its high school stadium with a new focus on school security and community engagement, according to a news release. The district partnered with Wold Architects and Engineers on the project as part of District #157’s year-long facilities master plan.

  • UNT Dallas Holds Ribbon-Cutting Ceremony for $100M STEM Building

    The University of North Texas at Dallas in Dallas, Texas, recently celebrated the opening of its new, $100-million STEM Building, according to local news. The ceremony on Dec. 2 preceded the first day of classes in the facility on Jan. 12, 2026.

  • North Carolina District Completes New Elementary School

    The Wake County Public School System (WCPSS) in Holly Springs, N.C., recently announced that construction on a new elementary school has finished, according to a news release. Rex Road Elementary School measures in at 133,000 square feet and is the fifteenth school that general contractor Balfour Beatty has completed for the district.

  • Image credit: O

    Strategic Campus Assessment: Moving Beyond Reactive Maintenance in Educational Facilities

    While campuses may appear stable on the surface, building systems naturally evolve over time, and proactive assessment can identify developing issues before they become expensive emergencies. The question isn't whether aging educational facilities need attention. It's how institutions can transition from costly reactive maintenance to strategic asset management in a way that protects both budgets and communities.

Digital Edition