Wenger Launches LED Light Fixture

Music and theater education solutions company Wenger Corporation recently announced the launch of the Novara LED light fixture, according to a news release. The product was intentionally designed as a retrofit for Diva Acoustic Shells, allowing venues to upgrade light fixtures within those shells to save on electricity costs without replacing the entire setup.

The news release reports that Novara serves as the only LED fixture designed as a 1:1 replacement for incandescent fixtures installed in the existing Diva Acoustical Shells. The LED bulbs offer comparable beam angles and lumen output to provide shell lighting of performance spaces at a more sustainable cost.

Novara LED Fixture
Photo Courtesy of Wenger Corporation

The Novara LED fixture offers a brightness of 6,800 lumens to fully illuminate the venue’s stage area. The new fixtures are also silent, lacking any buzzing or humming noises that might distract from a performance. The energy-efficient bulbs exude minimal heat and no ultraviolet or infrared radiation. They can also save organizations up to 86% on electricity costs and consumption.

The fixtures are individually controllable and addressable using DMX/RDM or mains dimming technology. The two-axis beam positioning allows for easy adjustability and fine-tuning to tailor it to a given performance. The bulb also has a lifespan 35 times as long as its predecessor, reducing both maintenance times and replacement costs.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Round Rock ISD Completes New Early College High School

    Round Rock ISD near Austin, Texas, recently announced that construction is complete on a new, 46,500-square-foot campus for Early College High School, according to a news release. The new facility will allow the school’s students and staff to move from portables into a permanent building and increase its enrollment to 500.

  • University of Arizona Approves New Residence Hall

    The Arizona Board of Regents recently approved plans for a new residence hall at the University of Arizona in Tucson, Ariz., according to a news release. The new facility is scheduled to open in fall 2028 and have the capacity for more than 1,200 students, enforcing a new university expectation that all first-year students live on campus.

  • Houston-Area High School Breaks Ground on 117,000SF Multi-Use Facility

    North Shore Senior High School, part of Galena Park ISD in Houston, Texas, recently broke ground on a new multi-use facility for student extracurriculars, according to a news release. The North Shore Multi-Use Facility will include dedicated practice and training space for the school’s athletics and fine arts programs.

  • How a Portable Sink Helped an Art Classroom Run More Smoothly

    Classroom design decisions can have outsized effects on instructional time and safety at schools juggling mismatched infrastructure, strict budgets, and crowded schedules — particularly in the arts. Between spilled paint and dirty brushes, art classes run smoother with a sink in the studio. But many schools don’t have a sink in every art classroom.