Schools In Focus: Being Transparent About School Safety Design

Schools In Focus is a podcast dedicated to the design, planning and management of educational facilities and campuses. Listen in as we chat with industry experts, facility managers, architects, security and safety professionals, and other thought leaders. Catch up on previous episodes here.

This episode’s guest is Devin Bowman, General Manager of Technical Glass Products (TGP) and AD Systems. We’ll talk about the relationship between school architecture and designing for safety as design aspects like natural light and floor-to-ceiling windows become more common. We’ll discuss how to give your school’s glass surfaces varying levels of protection to keep students safe. And we’ll also talk about TGP’s work with an elementary school in Oregon that focused on improving the building’s safety and security features. This episode is sponsored by Technical Glass Products.

Schools In Focus, Episode 38: Being Transparent About School Safety Design

 

Where to Listen

Schools In Focus is available on Apple Podcasts, Spotify, Google Podcasts, and Amazon Music. Subscribe today, or listen below!

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • Haws Corporation Marks 120th Anniversary

    Haws Corporation, which provides hydration and emergency safety solutions worldwide, recently announced that the company is celebrating its 120th anniversary this year, according to a news release.

  • CSU Starts Construction on New Engineering Building

    Colorado State University in Denver, Colo., recently began clearing space for the construction of the new Don and Susie Law Engineering Future Technologies Building, according to a news release.

  • New Jersey Day School Opens New Science & Entrepreneurship Building

    Saddle River Day School (SRDS) in Saddle River, N.J., recently celebrated the grand opening of the new Dr. Kristen Walsh Hall of Science & Entrepreneurship, according to a news release. The school partnered with DIG Architecture on the 32,000 square foot facility, completed on a 17-month construction timeline in time for the beginning of the new school year.