Fellowes Expands Lines of Monitor, Laptop Accessories

Interior workplace solutions provider Fellowes recently announced that it is expanding two of its popular product lines. The extensions to its Sena and Rising lines will offer new degrees of functionality and aesthetic appeal to a wide variety of corporate and educational environments, according to a news release.

Fellowes’ Sena line of monitor solutions now includes six new configurations. The SenaEX4 and SenaEX6 monitor arms can respectively hold four and six monitors, with additional options providing four quad configurations and two six-monitor configurations. The products assist with multi-monitor environments and provide additional flexibility regarding screen placement and comfort.

Fellowes is also releasing two new laptop holders, one for the Rising series and one for the Sena series. The products integrate with existing Fellowes products to provide secure and aesthetically pleasing arm support within the workspace.

The product line extensions come in black, white, or siler finishes. The models are Level 2 Certified and BIFMA Complaint, the news release reports.

About the Author

Matt Jones is senior editor of Spaces4Learning. He can be reached at [email protected].

Featured

  • S4L Announces 2026 Education Design Showcase Winners

    Spaces4Learning is thrilled to announce the winners of the 2026 Education Design Showcase! Now in its 27th year, the annual awards program honors innovative solutions in planning, design, architecture, and construction across K–12 and higher education.

  • UTampa Breaks Ground on STEM Academic Facility

    The University of Tampa in Tampa, Fla., recently broke ground on one of its largest academic facilities ever, according to a news release. The Dickey Science Innovation Center will measure 153,000 square feet and has a scheduled completion date of fall 2028.

  • Arizona District Breaks Ground on Community Training, Learning Center

    The Tolleson Union High School District (TUHSD) in Tolleson, Ariz., recently broke ground on a new Training & Learning Center (TLC) for both district professionals and the community at large, according to a news release. The 90,000-square-foot facility has an estimated completion date of spring 2027.

  • Universities Continue to Launch Multimillion-Dollar Campus Transformations

    What makes the current wave of campus development especially noteworthy is its emphasis on multi-use functionality and community integration. Institutions are no longer investing solely in academic or athletic facilities in isolation. Instead, they are creating destinations that blend recreation, health, housing, and event-driven economic activity.